Megabac Environnement — dumpster rental
Megabac Environnement roll-off truck placing a 20 cubic yard dumpster on a landscaping site in Montreal

Do You Need a Permit for a Dumpster?

On private property — your driveway, your yard — the vast majority of the cities we serve require no permit at all for the dumpster itself. The moment it rests on the street, the alley or the sidewalk, it is almost always a municipal authorization: sometimes simple and payable, sometimes with several business days' notice, sometimes refused outright. And one trap comes back everywhere: the work itself often needs its own permit, even where the dumpster needs none. We went and read the by-law of every city we serve — the checker below gives the answer for yours.

The short answer, before your city's

On your own land, there is generally nothing to apply for. Driveway, side yard, back yard: in the vast majority of the cities we serve, no permit, no certificate, no step to take before the box goes down. A few cities add a placement condition rather than a permit — keep a set distance from the street line, stay out of the front yard, leave a clearance, provide a screen — and they publish it in black and white in their zoning by-law.

On the street, it is the opposite. The roadway, the alley and the sidewalk belong to the municipality: occupying them almost always calls for an authorization, under one name or another — public-domain occupancy permit, road permission, certificate of authorization. It often comes with fees, which vary from city to city, and with a delay: several cities require the application several business days before delivery. And in a handful of the cities we serve, the answer is simply no: leaving an object there is an offence. In some, no procedure exists to get around it; in others, the only door is an exceptional permission, granted case by case when the land is too small.

Then comes the trap: the dumpster permit and the work permit are two different things. A city can require absolutely nothing for the box in your driveway, and still require a permit for the renovation you are doing. That is the section right after the checker, and it is the one that saves the bad surprises.

Why so much variation from one city to the next? Because there is no common rule. Every municipality writes its own by-law on the occupation of the public domain and its own list of certificates of authorization; in Montreal the question is settled borough by borough, each with its own schedule. Some cities name the dumpster in so many words, others never use the word and settle it at the counter. And several go the other way entirely: they require a dumpster on a permitted job site, as a condition of the building permit. Hence this page — someone had to go read, city by city, what each one actually says.

The permit, city by city

Click your city. The summary line gives you the answer right away for a dumpster set on your own land; open it and you also get the answer for the street, then the link to that city's page, where the by-law is quoted section by section. Two answers per city, because those are the only two situations there are.

Montreal 41 cities

Ahuntsic-Cartiervilleno permit, but three published placement rules

On your own land no permit, but three published placement rules

On the street the only borough that names the homeowner

Everything about Ahuntsic-Cartierville →

Anjouno application to file, but rules worth knowing

On your own land no application to file, but rules worth knowing

On the street $30 for the permit, $40 for each day of occupancy

Everything about Anjou →

Baie-D’Urféhere, you call planning before you set the date

On your own land here, you call planning before you set the date

On the street four hours maximum, at all times

Everything about Baie-D’Urfé →

Beaconsfieldtwo by-laws from the same town, two answers

On your own land two by-laws from the same town, two answers

On the street the town closed both doors

Everything about Beaconsfield →

Côte-des-Neiges–Notre-Dame-de-Grâcenothing to apply for, and no condition published

On your own land nothing to apply for, and no condition published

On the street $45 for the permit, then a rate per day

Everything about Côte-des-Neiges–Notre-Dame-de-Grâce →

Côte-Saint-Lucnothing found to apply for — and we say it carefully

On your own land nothing found to apply for — and we say it carefully

On the street permit required — the City answers the question itself

Everything about Côte-Saint-Luc →

Dollard-des-Ormeauxzoning names the job-site container — and allows it

On your own land zoning names the job-site container — and allows it

On the street a municipal council resolution, nothing less

Everything about Dollard-des-Ormeaux →

Dorvalone call to make before delivery

On your own land one call to make before delivery

On the street permit required — the by-law names dumpsters outright

Everything about Dorval →

Hampsteada permit exists, and it is free

On your own land a permit exists, and it is free

On the street Hampstead writes no, in plain terms

Everything about Hampstead →

L'Île-Bizard–Sainte-Genevièvethe Montréal framework, and one call that settles it

On your own land the Montréal framework, and one call that settles it

On the street the permit names dumpsters, and it comes in 2 business days

Everything about L'Île-Bizard–Sainte-Geneviève →

Île-des-Sœursno permit… and an authorization to obtain all the same

On your own land no permit… and an authorization to obtain all the same

On the street permit required, and the rate follows the segment

Everything about Île-des-Sœurs →

Kirklandno by-law found — and a phone call the town asks for

On your own land no by-law found — and a phone call the town asks for

On the street prior written authorization, never a tolerance

Everything about Kirkland →

Lachinewhat Lachine says, and what it has yet to say

On your own land what Lachine says, and what it has yet to say

On the street the roadway is billed by the width you block, never by the square metre

Everything about Lachine →

LaSallenothing to file

On your own land nothing to file

On the street the moment the dumpster touches the street or the lane

Everything about LaSalle →

Mercier–Hochelaga-Maisonneuvenothing to file, four conditions to hold

On your own land nothing to file, four conditions to hold

On the street the occupancy permit, Mercier–Hochelaga-Maisonneuve block

Everything about Mercier–Hochelaga-Maisonneuve →

Montrealno permit

On your own land no permit

On the street permit required, and 19 different fee schedules

Everything about Montreal →

Montreal Westnothing to apply for

On your own land nothing to apply for

On the street the permit is spelled out — and the street stays a last resort

Everything about Montreal West →

Montréal-Estnothing in the by-laws

On your own land nothing in the by-laws

On the street permit required — the by-law names the dumpster

Everything about Montréal-Est →

Montréal-Nordthe borough has not published its rule yet

On your own land the borough has not published its rule yet

On the street the public domain here counts the parking space too

Everything about Montréal-Nord →

Mount Royalnothing found to apply for — plus a three metre rule

On your own land nothing found to apply for — plus a three metre rule

On the street possible, priced, never overnight

Everything about Mount Royal →

Outremontno permit, on one condition only Outremont puts in writing

On your own land no permit, on one condition only Outremont puts in writing

On the street permit required, and the lane costs more

Everything about Outremont →

La Petite-Patriethe borough publishes nothing — we say it plainly

On your own land the borough publishes nothing — we say it plainly

On the street permit required, and everything is published

Everything about La Petite-Patrie →

Pierrefonds-Roxboro“no permit is required”

On your own land “no permit is required”

On the street a fallback, never a matter of comfort

Everything about Pierrefonds-Roxboro →

Pincourtnothing to apply for

On your own land nothing to apply for

On the street in Pincourt it is the building permit that opens the door

Everything about Pincourt →

Le Plateau-Mont-Royalnever in a front yard, and little yard is left

On your own land never in a front yard, and little yard is left

On the street $71.75 a day on the street, $80.75 in the alley

Everything about Le Plateau-Mont-Royal →

Pointe-Clairenothing to pay — a one-line email to Urbanisme

On your own land nothing to pay — a one-line email to Urbanisme

On the street possible — with the engineering permit in hand

Everything about Pointe-Claire →

Pointe-des-Cascadesthe by-law names the dumpster and allows it

On your own land the by-law names the dumpster and allows it

On the street the village's only occupancy permit is for film shoots

Everything about Pointe-des-Cascades →

Rivière-des-Prairies–Pointe-aux-Tremblesnothing to apply for, but 0.6 m to keep

On your own land nothing to apply for, but 0.6 m to keep

On the street a permit, and one flat surface rate

Everything about Rivière-des-Prairies–Pointe-aux-Trembles →

Rosemont–La Petite-Patriethe front yard is out, the other yards are the spot

On your own land the front yard is out, the other yards are the spot

On the street the by-law names the dumpster

Everything about Rosemont–La Petite-Patrie →

Saint-Laurentnothing to apply for

On your own land nothing to apply for

On the street permit required, and dumpsters are named in it

Everything about Saint-Laurent →

Saint-Léonardno permit, but a 1.8 m screen written into the zoning

On your own land no permit, but a 1.8 m screen written into the zoning

On the street ten business days ahead, and two rates that add up

Everything about Saint-Léonard →

Saint-Michelwhat the borough says, and what it does not

On your own land what the borough says, and what it does not

On the street two official pages name the dumpster

Everything about Saint-Michel →

Sainte-Anne-de-Bellevuethe town writes it itself — it is allowed

On your own land the town writes it itself — it is allowed

On the street neither banned nor free — a certificate and 100 $ a day

Everything about Sainte-Anne-de-Bellevue →

Sennevillethe one town where we do not write « no permit needed »

On your own land the one town where we do not write « no permit needed »

On the street a permit, an engineer's plan and a daily charge

Everything about Senneville →

Le Sud-Ouesttwo sentences, and nothing to file

On your own land two sentences, and nothing to file

On the street permit compulsory, and dumpsters are named in the text

Everything about Le Sud-Ouest →

Vaudreuil-Dorionnothing to apply for

On your own land nothing to apply for

On the street a permit exists, and it names the dumpster

Everything about Vaudreuil-Dorion →

Vaudreuil-sur-le-Lacnothing to apply for

On your own land nothing to apply for

On the street three texts close the door, none opens it

Everything about Vaudreuil-sur-le-Lac →

Verdunno permit

On your own land no permit

On the street permit needed, 2 business days' notice

Everything about Verdun →

Ville-Marieno occupancy permit — and here it is the first move

On your own land no occupancy permit — and here it is the first move

On the street permit compulsory, ten business days ahead

Everything about Ville-Marie →

Villeray–Saint-Michel–Parc-Extensionwhat the borough says, and what it does not

On your own land what the borough says, and what it does not

On the street the permit names dumpsters outright

Everything about Villeray–Saint-Michel–Parc-Extension →

Westmountno certificate found — and we say it carefully

On your own land no certificate found — and we say it carefully

On the street yes, with the City's certificate — in black and white

Everything about Westmount →

Laval 4 cities

Chomedeynothing to apply for — and on a job site, the dumpster is mandatory

On your own land nothing to apply for — and on a job site, the dumpster is mandatory

On the street permit required, and the sector's geometry writes the bill

Everything about Chomedey →

Lavalno permit — and the dumpster is in fact mandatory

On your own land no permit — and the dumpster is in fact mandatory

On the street permit required

Everything about Laval →

Laval-des-Rapidesnothing to file — and the box is required

On your own land nothing to file — and the box is required

On the street permit required, and the bill changes from street to street

Everything about Laval-des-Rapides →

Laval-Ouestno paperwork — and a job site must have a bin

On your own land no paperwork — and a job site must have a bin

On the street the Laval permit, down to the class of your street

Everything about Laval-Ouest →

North Shore 24 cities

Blainvillenothing to apply for

On your own land nothing to apply for

On the street no by-law, therefore no promise

Everything about Blainville →

Bois-des-Filiona call to the town before delivery

On your own land a call to the town before delivery

On the street possible during work, with the town's authorization

Everything about Bois-des-Filion →

Boisbriandnothing to apply for

On your own land nothing to apply for

On the street the by-law cannot be consulted, so we promise nothing

Everything about Boisbriand →

Charlemagneat your own address, the city asks for no permit

On your own land at your own address, the city asks for no permit

On the street a permit since June 10, 2026

Everything about Charlemagne →

Deux-Montagnesnothing to apply for — and the dumpster is written in twice

On your own land nothing to apply for — and the dumpster is written in twice

On the street a ban in three sections, and no permit to lift it

Everything about Deux-Montagnes →

Gorenothing to apply for — and on a job site, the dumpster is required

On your own land nothing to apply for — and on a job site, the dumpster is required

On the street one text allows it, two others close it again

Everything about Gore →

Lorrainethe dumpster is expected — and exempted by name

On your own land the dumpster is expected — and exempted by name

On the street where nothing gets promised

Everything about Lorraine →

Mascouchethe silence is solid

On your own land the silence is solid

On the street a certificate of authorization, and proof of insurance

Everything about Mascouche →

Mirabelno permit required — and we word it carefully

On your own land no permit required — and we word it carefully

On the street don't go there

Everything about Mirabel →

Okano permit for the box — but the dumpster itself is mandatory

On your own land no permit for the box — but the dumpster itself is mandatory

On the street only with the municipality's authorization

Everything about Oka →

Pointe-Calumetnothing to apply for — and one reservation we put in writing

On your own land nothing to apply for — and one reservation we put in writing

On the street in Pointe-Calumet, the answer is a phone call away

Everything about Pointe-Calumet →

Repentignythe zoning by-law says yes, in so many words

On your own land the zoning by-law says yes, in so many words

On the street 48 hours, then a $155 certificate

Everything about Repentigny →

Rosemèrenothing to apply for

On your own land nothing to apply for

On the street the question does not arise in Rosemère

Everything about Rosemère →

Saint-Colombannothing to apply for

On your own land nothing to apply for

On the street in Saint-Colomban there is no door

Everything about Saint-Colomban →

Saint-Eustacheno permit, but one strip to stay off

On your own land no permit, but one strip to stay off

On the street no permit exists, and setting one down is a nuisance

Everything about Saint-Eustache →

Saint-Hippolytenothing to apply for

On your own land nothing to apply for

On the street the by-law allows it, but only during construction work

Everything about Saint-Hippolyte →

Saint-Jérômethe by-law allows it in plain terms

On your own land the by-law allows it in plain terms

On the street possible in Saint-Jérôme, but as a last resort

Everything about Saint-Jérôme →

Saint-Joseph-du-Lacnothing to apply for the dumpster itself

On your own land nothing to apply for the dumpster itself

On the street yes, by municipal authorization, at 50 $ a day

Everything about Saint-Joseph-du-Lac →

Saint-Lin–Laurentidesno permit, but set-back rules apply

On your own land no permit, but set-back rules apply

On the street possible, but on a permit, priced and insured

Everything about Saint-Lin–Laurentides →

Sainte-Anne-des-Plainesno permit and no certificate, it is written

On your own land no permit and no certificate, it is written

On the street a certificate of authorization is required

Everything about Sainte-Anne-des-Plaines →

Sainte-Marthe-sur-le-Lacthe town names the dumpster and allows it

On your own land the town names the dumpster and allows it

On the street no — and the truck itself only rolls there as a local delivery

Everything about Sainte-Marthe-sur-le-Lac →

Sainte-Sophieno by-law found requires a permit

On your own land no by-law found requires a permit

On the street nothing allows it, and there is no wicket to ask at

Everything about Sainte-Sophie →

Sainte-Thérèsein the city's own words

On your own land in the city's own words

On the street the city has already answered, and it is no

Everything about Sainte-Thérèse →

Terrebonnenothing to apply for

On your own land nothing to apply for

On the street by-law 725 names the dumpster outright

Everything about Terrebonne →

South Shore 23 cities

Belœilno permit required by the by-laws

On your own land no permit required by the by-laws

On the street a $50 road-occupancy permission

Everything about Belœil →

Bouchervilleno

On your own land no

On the street yes, since June 1, 2026

Everything about Boucherville →

Brossardthe zoning by-law allows it outright

On your own land the zoning by-law allows it outright

On the street $60, seven business days, and the City's form names the dumpster

Everything about Brossard →

Candiacno certificate — the City puts it in writing

On your own land no certificate — the City puts it in writing

On the street a discretionary authorization, $50 plus a daily fee

Everything about Candiac →

Châteauguayno certificate required under the permits by-law

On your own land no certificate required under the permits by-law

On the street an occupancy permit, charged by the day

Everything about Châteauguay →

Contrecœura zoning line we get settled, not guessed

On your own land a zoning line we get settled, not guessed

On the street in Contrecœur the by-law writes the word « conteneur »

Everything about Contrecœur →

Delson“none,” says the official table

On your own land “none,” says the official table

On the street a certificate, with a copy sent to the police

Everything about Delson →

Greenfield Parknothing to apply for

On your own land nothing to apply for

On the street a permit is required, priced by the day

Everything about Greenfield Park →

Kahnawà:kethere is no construction permit to apply for

On your own land there is no construction permit to apply for

On the street no rate, no form, but two prohibitions

Everything about Kahnawà:ke →

Longueuilwhere the public domain ends

On your own land where the public domain ends

On the street permit required

Everything about Longueuil →

Mercierhere, the dumpster does not go without a permit

On your own land here, the dumpster does not go without a permit

On the street three by-laws, and none of them says yes

Everything about Mercier →

La Prairieconfirm it with one phone call

On your own land confirm it with one phone call

On the street a certificate of authorization, in black and white

Everything about La Prairie →

Saint-Amablenothing to apply for

On your own land nothing to apply for

On the street in Saint-Amable, you ask for it

Everything about Saint-Amable →

Saint-Bruno-de-Montarvillenothing to apply for

On your own land nothing to apply for

On the street certificate required, $125 a day

Everything about Saint-Bruno-de-Montarville →

Saint-Constantthe city's own permit table says « None »

On your own land the city's own permit table says « None »

On the street nothing without the city's express authorization

Everything about Saint-Constant →

Saint-Lambertnothing to apply for

On your own land nothing to apply for

On the street Saint-Lambert writes the word « conteneur »

Everything about Saint-Lambert →

Saint-Mathieu« None », says the Municipality's own table

On your own land « None », says the Municipality's own table

On the street a certificate of authorization, and two texts that do not agree

Everything about Saint-Mathieu →

Saint-Philippenothing to apply for

On your own land nothing to apply for

On the street the truck has thirty minutes, the dumpster does not stay

Everything about Saint-Philippe →

Sainte-Catherinethe permit already does the job

On your own land the permit already does the job

On the street written authorization, or nothing

Everything about Sainte-Catherine →

Sainte-Julienothing to file

On your own land nothing to file

On the street ten business days ahead

Everything about Sainte-Julie →

Sainte-Martinezoning names the dumpster and allows it

On your own land zoning names the dumpster and allows it

On the street nothing allows it, and three by-laws point the other way

Everything about Sainte-Martine →

Varennesnothing to apply for

On your own land nothing to apply for

On the street free for 24 hours, authorized beyond that

Everything about Varennes →

Verchèresside and back beyond debate, the front gets checked

On your own land side and back beyond debate, the front gets checked

On the street a certificate exists, named and priced — 20 $

Everything about Verchères →

Montérégie 37 cities

Beauharnoiswhat we checked, and where we stop

On your own land what we checked, and where we stop

On the street Beauharnois has a by-law for that

Everything about Beauharnois →

Carignannothing to apply for

On your own land nothing to apply for

On the street Carignan regulates it, prices it — and keeps the last word

Everything about Carignan →

Chamblyno permit required

On your own land no permit required

On the street no permit on the books, but 7 days and one third of the roadway

Everything about Chambly →

Hemmingford (Township)the by-law names the dumpster — and sets one condition

On your own land the by-law names the dumpster — and sets one condition

On the street nothing allows it, and a brand-new by-law is coming

Everything about Hemmingford (Township) →

Hemmingford (Village)no by-law found that requires anything

On your own land no by-law found that requires anything

On the street nothing allows it, and three texts stand against it

Everything about Hemmingford (Village) →

Henryvilleno permit for the dumpster — but the spot gets confirmed

On your own land no permit for the dumpster — but the spot gets confirmed

On the street no

Everything about Henryville →

Lacollenothing to apply for

On your own land nothing to apply for

On the street Lacolle provides for it, prices it — and sends it to council

Everything about Lacolle →

Marievillethe town wrote the answer, and it is « none »

On your own land the town wrote the answer, and it is « none »

On the street named, prohibited, and capped at one third of the width

Everything about Marieville →

McMastervillethe honest answer

On your own land the honest answer

On the street a certificate of authorization, never a right

Everything about McMasterville →

Mont-Saint-Grégoirenothing to apply for, and a by-law that requires it

On your own land nothing to apply for, and a by-law that requires it

On the street written authorization from the municipal inspector, or nothing

Everything about Mont-Saint-Grégoire →

Mont-Saint-Hilairethe reflex the city itself imposes

On your own land the reflex the city itself imposes

On the street permit required, no exceptions

Everything about Mont-Saint-Hilaire →

NoyanNoyan is the one town that writes it down

On your own land Noyan is the one town that writes it down

On the street no by-law we found provides for it

Everything about Noyan →

Otterburn Parknothing to ask for

On your own land nothing to ask for

On the street by-law 482 imposes its permit

Everything about Otterburn Park →

Richelieunothing to apply for

On your own land nothing to apply for

On the street Richelieu names the dumpster and hands you the form

Everything about Richelieu →

Rougemontnothing to apply for

On your own land nothing to apply for

On the street Rougemont names the container, and leaves a door ajar

Everything about Rougemont →

Saint-Antoine-sur-Richelieuno permit — but zoning picks the yard

On your own land no permit — but zoning picks the yard

On the street a path exists, and it is marked out

Everything about Saint-Antoine-sur-Richelieu →

Saint-Basile-le-Grandno certificate — the town writes it in black and white

On your own land no certificate — the town writes it in black and white

On the street possible, but paid, insured and supervised

Everything about Saint-Basile-le-Grand →

Saint-Blaise-sur-Richelieunothing to apply for — and the by-law requires it

On your own land nothing to apply for — and the by-law requires it

On the street nothing without the inspector's written authorization

Everything about Saint-Blaise-sur-Richelieu →

Saint-Césaireno permit required by the published texts

On your own land no permit required by the published texts

On the street two texts, two conditions — call the town

Everything about Saint-Césaire →

Saint-Charles-sur-Richelieunothing to apply for — and why we word it carefully

On your own land nothing to apply for — and why we word it carefully

On the street two locks, a single door

Everything about Saint-Charles-sur-Richelieu →

Saint-Denis-sur-Richelieunothing to apply for

On your own land nothing to apply for

On the street a 50 $ certificate — and a 30-day wait

Everything about Saint-Denis-sur-Richelieu →

Saint-Étienne-de-Beauharnoisnothing to apply for, three conditions to meet

On your own land nothing to apply for, three conditions to meet

On the street nothing allows it, and two texts run against it

Everything about Saint-Étienne-de-Beauharnois →

Saint-Hyacinthenothing required, with one nuance

On your own land nothing required, with one nuance

On the street yes, on the Service du génie's flat fee

Everything about Saint-Hyacinthe →

Saint-Jean-sur-Richelieuno permit required

On your own land no permit required

On the street mandatory authorization from Public Works

Everything about Saint-Jean-sur-Richelieu →

Saint-Joseph-de-Sorelno permit found for the dumpster itself

On your own land no permit found for the dumpster itself

On the street a permit exists, and it asks for a 1,000 $ deposit

Everything about Saint-Joseph-de-Sorel →

Saint-Marc-sur-Richelieuthe municipality ticked the box itself

On your own land the municipality ticked the box itself

On the street possible during work, on a free certificate

Everything about Saint-Marc-sur-Richelieu →

Saint-Mathias-sur-Richelieuno permit found — and the container is required

On your own land no permit found — and the container is required

On the street two by-laws cross paths — we promise nothing

Everything about Saint-Mathias-sur-Richelieu →

Saint-Oursno permit, one reservation to be settled

On your own land no permit, one reservation to be settled

On the street no procedure at all — which authorizes nothing

Everything about Saint-Ours →

Saint-Paul-de-l’Île-aux-Noixthe by-law names the dumpster, and asks for nothing

On your own land the by-law names the dumpster, and asks for nothing

On the street the public way starts at the ditch

Everything about Saint-Paul-de-l’Île-aux-Noix →

Saint-Pienothing published requires a permit — and we say it carefully

On your own land nothing published requires a permit — and we say it carefully

On the street « any object whatsoever » needs prior permission

Everything about Saint-Pie →

Saint-Rémino permit found — and we word it carefully

On your own land no permit found — and we word it carefully

On the street an authorization required, in black and white

Everything about Saint-Rémi →

Sainte-Anne-de-Sabrevoisnothing to apply for — and for a demolition, the dumpster is required

On your own land nothing to apply for — and for a demolition, the dumpster is required

On the street three texts, no way out

Everything about Sainte-Anne-de-Sabrevois →

Sainte-Madeleinenothing published to apply for

On your own land nothing published to apply for

On the street no published procedure in Sainte-Madeleine

Everything about Sainte-Madeleine →

Sainte-Marie-Madeleineno permit found, and a call worth making anyway

On your own land no permit found, and a call worth making anyway

On the street nothing to ask for, and nothing that allows it

Everything about Sainte-Marie-Madeleine →

Sainte-Victoire-de-Sorelno permit found for the dumpster itself

On your own land no permit found for the dumpster itself

On the street nothing allows it, and three sections point the other way

Everything about Sainte-Victoire-de-Sorel →

Salaberry-de-Valleyfieldzoning allows it, and says so

On your own land zoning allows it, and says so

On the street no by-law we read allows it

Everything about Salaberry-de-Valleyfield →

Sorel-Tracythe zoning by-law spells it out

On your own land the zoning by-law spells it out

On the street nothing without a work permit already issued

Everything about Sorel-Tracy →

Estrie 3 cities

Dunhamnothing to apply for the dumpster itself

On your own land nothing to apply for the dumpster itself

On the street we promise nothing in Dunham

Everything about Dunham →

Farnhamnothing to apply for

On your own land nothing to apply for

On the street you ask for it, you don't take it

Everything about Farnham →

Granbyno permit

On your own land no permit

On the street written permission

Everything about Granby →

Your city is not listed? The territory is wider than the pages already written: the form carries an « Autres villes » entry, and one call to 514 708-2424 settles it in a minute. If the answer has not been verified for your city yet, we will say so plainly rather than improvise a rule.

Every answer comes from the city's own by-law, read and quoted on that city's page, as of the research date shown there. By-laws are amended, fee schedules change, pilot projects expire: before you book, confirm with your city — or call us at 514 708-2424 and we will reach them with you.

The dumpster permit is not the work permit

It is the most common mix-up in the trade, and one sentence undoes it: two different permits, issued by two different departments. The box, when it rests on the street, belongs to whichever department runs the roads, engineering or public works. The work belongs to urban planning — building permit, renovation permit, certificate of authorization, declaration of work, depending on your city's vocabulary.

The direct consequence: you may have no permit at all to apply for on the dumpster and still owe a permit for your job site. What triggers it changes from city to city — some require the permit with no cost threshold whatsoever, others from a value of work of their own, others again replace the permit with an online declaration, free but mandatory before the first hammer blow. Redoing a roof, opening a wall, extending, demolishing: the question comes up before the dumpster does, and it is settled at urban planning.

The trap works in the other direction too, and that one surprises everyone: several cities we serve make the dumpster mandatory on a permitted job site. In signing the permit, the applicant undertakes to install on the private property a waste container of sufficient capacity for the work — and in at least one of our cities, its absence automatically revokes the building permit.

The reflex that settles all of it: when you apply for your work permit, ask about the dumpster at the same counter. That is the department that knows both answers. Your city's phone number and the detail of its by-law live on its page, along with what our drivers know about the local ground.

When the dumpster has to go on the street

The street is almost never a matter of convenience: it is a fallback, for when the driveway is too short, too steep or already full. Here is what cities generally ask for — and what we promise, or do not.

What cities ask for, where the street is allowed

  • An authorization obtained before delivery, never after: several cities require the application several business days ahead, and the response time can outlast your job site
  • Fees, which vary from city to city: by the day, by the area occupied, at a flat rate — or nothing at all, depending on where you are; the detail lives on each city's page, because it changes
  • Proper signage: most cities that regulate the occupancy require barricading — cones, trestles, reflective material — and a few add flashing lights at night
  • A width left clear: a dozen of the cities we serve cap the share of roadway that may be occupied — a third, most often — and several require a clear passage for pedestrians, a few for emergency vehicles
  • Full liability for damage, sometimes with proof of insurance to be filed with the application
  • Restoring the site at the end, residue included — failing which the city has the cleanup done at the holder's expense

What we promise — and what we do not

  • The spot is looked for on your own land first: that covers the vast majority of our deliveries, and that is exactly what the PROTEC-O-SOL planks are for
  • If the street is your only option, we call the city together — before the date is set, not after
  • We never promise the street in advance: in several of the cities we serve the answer is no, and it is written in the by-law
  • We do not file the application for you: the authorization is issued to the occupant of the public domain, not to the hauler who delivers the box
  • Without the authorization in hand, the box does not come down on the roadway: we reschedule the delivery rather than expose a customer to one ticket per day of occupancy

The questions we get about permits

What is the difference between a dumpster permit and a work permit?

Two permits, two departments. The public-domain occupancy permit covers the box, and only when it rests on the street, the alley or the sidewalk: it comes from roads, engineering or public works. The building permit or the certificate of authorization covers the work: it comes from urban planning, and it is often applied for well before the dumpster is delivered. A city can require no permit at all for the dumpster in your driveway while requiring one to redo your roof. Both answers are on your city's page.

If the dumpster is in violation, who gets the fine?

The authorization to occupy the public domain is issued to a named person: the one doing the occupying, so the owner or the contractor having the work done — not the hauler who delivered the box. That is the person the ticket names. A detail that surprises people: in several of the cities we serve, each day of occupancy without authorization counts as a separate offence. Which is exactly why we would rather settle the question before delivery.

What if the dumpster sticks out a little onto the sidewalk?

The sidewalk is part of the public domain just as much as the roadway: the moment the box bites into it, even by a few inches, the occupancy has begun and the authorization becomes necessary. Several cities go further and refuse any encroachment on a sidewalk or a bike path, authorization or not. There is also the person in a wheelchair or with a stroller who has to step into the street to get around it. In practice the fix is almost always a few feet back into the driveway: the driver adjusts on the spot, it takes a minute.

Does Megabac take care of the permit?

No, and nobody can honestly promise you that: the authorization is issued to the occupant of the public domain, and the city decides based on the street, the season and the parking. What we do: we validate the spot with you on the phone before confirming the date, we tell you what your city requires — it is written on its page — and if the street is your only option, we call the city together. In the vast majority of deliveries the question never comes up: the box fits in the driveway, on the PROTEC-O-SOL planks.

How long can a dumpster stay in place?

Two clocks run at once. The city's, if you are occupying the street: the authorization is issued for a set duration, often a short one, sometimes capped per address over twelve months, sometimes renewable — your city's page gives the rule. And the rental's: 7 days are included for homeowners, 15 days for contractors, and the counter stops the moment you authorize pick-up. On your own land, the usual limit is the job site itself: several cities require the box to leave when the work ends.

What if my city has no by-law on dumpsters at all?

It happens, and we write it as such on that city's page rather than invent a rule. But the absence of a by-law is not a permission: the street remains the municipality's public domain, and public works can ask for the box to be removed. Our reflex does not change — the spot is looked for on your own land first, and if the street is the only option, we call the city together before booking.

Free quote

It takes a minute — and the team gets back to you quickly.

5.0 · 227 Google reviews

What happens next: we email you a clear quote — exact price, recommended size, possible date. To book, we phone you.

One minute on the phone, and the question is settled

Tell us your city and where you want the box: we tell you what your city requires, we confirm the size and the date. Seven days a week, from someone who does this trade every day.