Hub city of the MRC de Pierre-De Saurel, Sorel-Tracy gets the 10, 20 and 40 cubic yard dumpsters of Megabac Environnement, plus four single-material formats — soil-rocks-sod, concrete, bricks and mortar, or asphalt. Here, the zoning by-law names the job-site dumpster itself and allows it while the work lasts. Availability and pricing: 514 708-2424.
Super compagnie !! Très bon service ! Ponctuel et courtois, je vous le recommande fortement !
Excellente expérience du début à la fin. Service rapide, professionnel et très efficace. Je recommande fortement.
Super service! Le conteneur est arrivé comme prévu et un prix très raisonnable. Jonathan répond toujours au téléphone. Service à la clientèle impeccable!
J'ai loué un conteneur à déchets pour des rénovations, et tout s'est déroulé super bien. Ils sont vraiment professionnels, rapides, et je les recommande à 100 %.
It takes a minute — and the team gets back to you quickly.
5.0 · 227 Google reviews
What happens next. An advisor reviews your request — the size, your city and its rules, site access — then emails you a clear quote. If you decide to book, we phone you. For an urgent delivery, call 514 708-2424.
Dumpster rental — or bin rental, as many Montrealers call it — for the big cleanout, an estate, a renovation or a demolition: dry materials, soil, concrete, bricks, asphalt and more.
14' long × 8' wide × 2.5' high · 3 to 4 pickup-truck loads
A 20-yard filled halfway: same footprint, just lower — choosing it won't free up space in a short driveway.
For guidance only — the exact size cannot be guaranteed.
14' long × 8' wide × 5' high · 6 to 8 pickup-truck loads
About the size of a Dodge Caravan — you can already picture it
20' long × 8' wide × 7' high · 12 to 16 pickup-truck loads
Our practical guide helps you choose the right size for your project — renovation, demolition, soil, concrete, bricks, asphalt — with the conditions and the FAQ.
Libération Express
Every rental includes 7 days — 15 for contractors. But if you work fast, our quick-release promotion rewards you:
More than 48 hours after delivery, the promotion no longer applies — your 7-day rental simply continues, without the credit.
Freeing up dumpsters sooner is also what lets us deliver faster everywhere in Sorel-Tracy — everyone wins.
Offer valid during the high season (March to October).
A full dumpster is heavy, and drop-off and pickup are when asphalt gets marked. Every Megabac dumpster arrives clean, safe and fitted with the exclusive PROTEC-O-SOL system: built-in planks that spread the load and protect your asphalt, concrete or paved driveway. Nothing to supply, nothing extra to pay.
Even with the planks, the dumpster is still a steel box. Before the truck arrives, lay down four flattened cardboard boxes — or a thin sheet of plywood — where the dumpster will sit: the steel never touches your asphalt or your pavers directly. Two minutes of prep, zero worries.
The price depends on the size, the type of materials, how long you keep it — and your area. The form above or a two-minute call is all it takes to get your exact price, fast. What makes up the price, in plain words → And if you free up the dumpster within 48 hours of delivery, the Libération Express credit applies — details below.
Size is not the whole story: dumpsters are rented by material type. Each type goes to a different disposal facility — that is why mixed loads bring extra fees. One choice to make, five options:

10, 20 and 40 cubic yards
The do-it-all dumpster: wood, drywall, metal, shingles, furniture — mixed, no problem.

20 yard — the only size offered
Excavation, grading, sod removal — soil, rocks and sod, nothing else.

20 yard — the only size offered
Walkways, slabs, foundations — broken concrete, nothing else.

20 yard — the only size offered
Walls, chimneys, masonry facing — bricks and mortar, nothing else.

20 yard — the only size offered
Old torn-up paving, curb pieces — asphalt, nothing else.
Why it matters. A dumpster rented for concrete that shows up at the disposal facility with wood in it is refused at the concrete rate: the sorting gets billed back. If you have several types of materials, say so in the form or at 514 708-2424 — we point you to the right type, or to two dumpsters when that costs less than sorting fees.
Tires
Paint, solvents, oils
Propane, aerosols, acidsYes, and that is rare. Section 263 of by-law 2222 forbids installing a container on a lot to carry on a use there, then specifies that the prohibition is neither intended nor able to prohibit the use of a container to receive residual materials while work is being carried out. The job-site dumpster is written into the zoning. One reservation travels with the sentence — subject to the provisions applicable to its siting — and it translates simply: the box stays entirely on your land, never in the street right-of-way, strip of lawn included.
The public-safety by-law in force (RM-2017, section 6.1.9 f)) makes it a nuisance to leave construction debris — boards, pipes, bricks, nails, steel, asphalt shingles, vinyl — anywhere other than in a container intended for it. The fine is $125 for an individual and $250 for a legal person, doubled on a repeat offence. The preceding paragraph tolerates materials in the open only while work is under way. One honest limit, written into the last paragraph: the provision does not apply to commercial, industrial, forestry or farming activities that comply with the zoning. It aims at the residential lot, not at an industrial site in good standing.
For a car trunk, largely: entry costs residents of the MRC de Pierre-De Saurel nothing, on proof of residence, and the site sits inside the city. For a job site, four walls go up. It shuts its door on any material coming from a commercial business — the MRC writes it just that way. Sorting is mandatory on site and wheeled carts are not admitted, even to make hauling easier: everything comes off by hand. From December through March it opens only on Thursdays, Fridays and Saturdays, until 4 p.m. And late in the day, once the maximum intake capacity is reached, the gate can close on the last to arrive.
Often, but it gets measured first. The plan of the 1780s left square blocks, narrow lots and driveways shorter than elsewhere in the city. The marker is simple: count about the size of a Dodge Caravan for a 20-yard, and if the minivan fits in the driveway, so does the box. The reflex of dropping to the 10-yard to gain room does not work, since it is a 20-yard filled halfway: the height comes down, the footprint stays put. When the driveway truly falls short, we look at the side yard, and we only talk about the street if work has already been permitted.
A work permit first. Section 52 of construction by-law 2224 allows a public street to be used following the issue of a building permit or a certificate of authorization, and subject to the authorization of the designated officer. Then come eight conditions: no more than one third of the width of the street, at least one sidewalk clear at all times, marking by day and lights by night, a 1.8-metre ceiling on the height of materials, an insurance policy in the name of the person responsible for the work, and a full clean-up at the end. The fee by-law also provides for a temporary public-domain occupancy certificate at $0, but no text says it is the same piece of paper: we call the planning department with you, at 450 780-5600, ext. 5690, before booking. With no permitted work, nothing covers the street, and an object obstructing traffic can be removed at your expense.
Yes, to deliver. By-law 2197 closes the roads listed in its schedule A — grouped into sixteen zones numbered 1 to 16 — to trucks of 4,500 kg gross vehicle weight rating and up, and to tool vehicles. Its section 4 sets aside local delivery, which the by-law defines itself: delivering goods, picking them up, providing a service or performing work in a zone where a sign allows access. The mention of the sign belongs to that definition; it is not invented. Two practical consequences: the truck arrives, drops the box and leaves, it does not idle at the curb. And on rue Augusta, between rue du Roi and rue de la Reine, only the loading or unloading manoeuvre, carried out without interruption, escapes the ban.
The 20-yard handles most of these projects — shingles, drywall, cabinets, old floors — and it is placed at a glance: about the size of a Dodge Caravan. The 40-yard is kept for demolitions and commercial job sites; the 10-yard becomes useful when it is the weight that climbs rather than the volume. Watch out for mixing: a box rented for soil and rocks, for concrete, for bricks and mortar or for asphalt takes that material and nothing else, on pain of sorting fees. Seven days are included, extendable by agreement. The other way round, a box freed up within 48 hours of delivery opens the Libération Express credit of $50, put back on your credit card. Offer valid during the high season (March to October).
And elsewhere? We checked the permit rule in every city we serve, by-law in hand — because it is never the same from one city to the next.
Check another city
We deliver to every neighbourhood in Sorel-Tracy — and we know the area.
The 2021 census credits Sorel-Tracy with 35,165 residents and 17,069 occupied private dwellings across 57.28 km², or 614.0 people per square kilometre. The city is ageing along with its buildings: the median age reaches 53.2, and 39.9% of households hold a single person. Among the dwellings, 52.6% are single detached houses. Above all, 4,435 dwellings date from 1960 or earlier and 6,955 from 1961 to 1980, against only 570 built between 2016 and 2021, while 935 were calling for major repairs. So the box is not here to raise anything new: it empties roofs, bathrooms, basements and replaced windows.
Vieux-Sorel is no ordinary neighbourhood. It is a grid drawn in the early 1780s by Major John French and Surveyor General Samuel Holland: perfectly square blocks around the Carré Royal, classified as a heritage property on March 24, 1961, whose walkways trace the Union Jack, and streets that borrow their names from the royal family — Charlotte, George, du Roi, du Prince. That regular plan leaves narrow lots and short driveways. This is where the size marker earns its keep: a 10-yard is a 20-yard filled halfway — the same rectangle on the ground, simply lower. Going down a size never lengthens a driveway.
In the Tracy sector — the former town that became an official sector at the merger of March 15, 2000 — and in the belts built between 1961 and 1980, driveways stretch out and take the 20-yard, about the size of a Dodge Caravan. The PROTEC-O-SOL floor, planks included, spreads the load over the asphalt; our drivers' tip fits in one sentence: lay four flattened cardboard boxes or a thin sheet of plywood where the box will land, because under the paint there is nothing but steel. And if you are hunting for the name of your own sector, the city officially delimits only eight, its electoral districts: Bourgchemin, Richelieu, Saint-Laurent, Vieux-Sorel, Du Faubourg, Des Gouverneurs, Des Patriotes and Pierre-De Saurel.
Statistics Canada, 2021 Census Profile (Sorel-Tracy, V); Répertoire du patrimoine culturel du Québec, Carré Royal record; Commission de toponymie du Québec; by-law 2461 of the City of Sorel-Tracy — consulted August 17, 2026.
The planning by-law draws a clear line between two industrial parks. Parc industriel Joseph-Simard follows Autoroute 30 — the “autoroute de l'Acier” in municipal regulations, its official name — between route Marie-Victorin and the rail line. Parc industriel Ludger-Simard hugs the rivière Richelieu, on the grounds of the old Marine Industrie shipyards. Add the industrial-port complex and its six million square feet of industrially zoned land: its multimodal handling area was inaugurated on September 14, 2021, and its operator, QSL International ltée, is putting 30 million dollars into it over five years for close to 40 jobs. Autoroute 30, the CN rail line and the fleuve Saint-Laurent all reach the site.
On October 9, 2025, Rio Tinto Fer et Titane announced the permanent shutdown of its Usine des poudres métalliques; its metallurgical and critical minerals complex keeps turning out titanium dioxide, high-purity iron, steel billets and scandium oxide. Along Autoroute 30 and route Marie-Victorin, the Technopole en écologie industrielle and the Centre de transfert technologique en écologie industrielle, attached to the Cégep de Sorel-Tracy, round out the picture. On the retail side, the characterization study carried into the planning by-law goes back to 2012: it counted 853 places of business at the time, 45% of them downtown and on boulevard Fiset Nord.
For every one of those businesses, the municipal door is shut before anyone knocks: the MRC keeps its ecocentre for residents, and nothing coming out of a commercial business is taken in. The 40-yard therefore stays at the foot of the job site, emptied at the pace of the work, driven by someone who knows the sixteen zones of schedule A to by-law 2197: on those roads, a truck of 4,500 kg or more comes in only for a local delivery, in a sector where a sign allows it.
City of Sorel-Tracy, planning by-law (by-law 2221, section 3.3), industrial-port complex page, by-laws 2197 and 2461; Rio Tinto news release of October 9, 2025; MRC de Pierre-De Saurel, Écocentre page — consulted August 17, 2026.
A temporary car shelter is allowed from October 1 to April 30, only inside an off-street parking area and at least 2.5 metres back from the curb or the pavement; outside that window it must come down entirely, support structure included. Seven months a year, the tarp therefore monopolizes the very rectangle of asphalt the box would take. That is winter's real constraint in Sorel-Tracy: a contest for ground space, not a ban on dumpsters. And taking a smaller size settles nothing, since the 10-yard keeps the footprint of the 20.
Out on the street, the rule is conditional. From November 15 to April 15, parking on a public road is prohibited between 1 a.m. and 7 a.m. whenever a snow-removal operation is triggered, and stays prohibited until that operation is declared over. Checking falls to the vehicle owner: the operation is announced each day from 3:30 p.m. on the info-déneigement line, at 450 551-8095, and by free email or text alert. The fine the city advertises is $294, fees included, with towing possible. The city puts figures on its thresholds as well: crews head out when 2.5 cm has settled on the ground, the blower comes once accumulations pass 5 cm, and a full cycle of clearing then hauling takes about three days. None of that names a dumpster — the rule covers road vehicles — but at night the roadway no longer belongs to the people who live on it.
Two last things before January. Pushing, blowing or heaping snow into a street or its right-of-way is a nuisance, and an owner who hires a snow contractor answers for the offence that contractor commits: a box set too close to the mouth of the driveway ends up moving that problem onto your side of the line. And the municipal way out narrows: the ecocentre drops to three opening days out of seven from December through March, and bulky-item collection stops altogether from November to March.
City of Sorel-Tracy, Info-déneigement and overnight parking pages, by-laws 2222 (s. 84) and 2376 (RM-2017, ss. 5.2.3, 5.2.4 and 6.1.6); MRC de Pierre-De Saurel, ecocentre and 2026 collection calendar — verified August 17, 2026.
Living in the hub city means having it at hand, without a kilometre to drive. Nothing to pay either, for anyone living in the MRC who can prove it. What remains is what the site will not do.
| The rule | What it means for a job site |
|---|---|
| Nothing that comes from a business | The MRC puts it bluntly: nothing coming out of a commercial business is taken in here. For a contractor working in Sorel-Tracy, the question is settled before it is asked. |
| Five days in summer, three in winter | From April 1 to November 29, 2026, Wednesday through Sunday until 4:15 p.m.; from December 4, 2025 to March 28, 2026, Thursdays, Fridays and Saturdays only, until 4 p.m. |
| You sort, then you unload | Sorting is mandatory on site, and wheeled carts are not admitted, even to make hauling easier: drywall, wood, aggregates and shingles get separated by hand. |
| A capacity that can close the gate | The site does not stretch: once it touches its maximum intake capacity, it can stop admitting the last arrivals of the day. |
| Three quarters of the tonnage comes off job sites | In 2020, 2,970 of the 3,943 tonnes received came from construction, renovation and demolition work. The site knows the material; it simply takes it in a trickle. |
At the curb, two details finish the demonstration. The 2026 calendar splits the city's addresses into sectors A, B, E, F, G and H, and requires carts to be set out on your own property, in the driveway or on the lawn, along the street — never in the road, never on the sidewalk, never on the bike path. And the extra cart, capped at 360 litres by by-law 2181, went from $120 in 2023 to $180 for the year 2026 — without taking a cubic metre of drywall any more readily. As for bulky items, they are picked up one week a month between April and October — five winter months with no pass at all — the refusal list names construction materials along with doors and windows, and whatever goes up into the truck leaves for landfill unsorted.
MRC de Pierre-De Saurel (Écocentre, Encombrants and Déchets pages), 2023-2030 PGMR (tables 4-2 and 4-3), Sorel-Tracy's 2026 collection calendar and municipal by-law 2181 — consulted August 17, 2026.
Call us for fast, friendly, professional service — or fill out the form and we'll get back to you with the right size and the price.