Why one page per city rather than a single one
Because “do you deliver to my place?” is never the only question. The next one follows immediately: where does the box go, and under which rule? Two cities in the same territory answer in opposite ways.
In Westmount, the public domain occupancy by-law adopted on 6 May 2024 names the dumpster outright among the temporary occupations that can be authorized: the street is possible, with the City's certificate, requested from the Engineering department at least 72 hours ahead. That matters, because the row houses of the plateau south of rue Sherbrooke, built almost entirely between 1890 and 1914, often have no driveway at all. And since 2025, another by-law requires a fenced protection zone around job-site trees: the dumpster's spot is chosen outside those zones at booking time — not once the truck is on site.
In Mirabel, 484 km² and thirteen sectors, it is the opposite: the construction by-law requires a permit to occupy public property, yet the table of authorization certificates provides none for a temporary dumpster. So we promise nothing on Mirabel pavement and we set nothing down there: the spot is found on your own land. The city does have four ecocentres, one per major sector, but their rules exclude by name “industries, businesses, contractors and owner-builders”.
Multiply that by the number of municipalities in the territory and you have the reason these pages exist. Brossard reads as seventeen sectors identified by a letter — the same letter that starts the names of your local streets. The zoning by-law of Sorel-Tracy names the job-site dumpster itself and allows it while the work lasts. In Granby, the dumpster is above all the way out for whatever the ecocentre on rue André-Liné turns away — soil and reinforced concrete. None of that would fit on a single page, and knowing it saves you a call.