In Rougemont, Megabac Environnement delivers dumpsters across the whole territory: three sizes for mixed dry materials — 10, 20 or 40 cubic yards — plus four dumpsters reserved for a single material: soil-rock-sod, concrete, brick and mortar, asphalt. PROTEC-O-SOL planks are included and protect your driveway, gravel included. One call to 514 708-2424 gives you the size, the price and the date.
Super compagnie !! Très bon service ! Ponctuel et courtois, je vous le recommande fortement !
Excellente expérience du début à la fin. Service rapide, professionnel et très efficace. Je recommande fortement.
Super service! Le conteneur est arrivé comme prévu et un prix très raisonnable. Jonathan répond toujours au téléphone. Service à la clientèle impeccable!
J'ai loué un conteneur à déchets pour des rénovations, et tout s'est déroulé super bien. Ils sont vraiment professionnels, rapides, et je les recommande à 100 %.
It takes a minute — and the team gets back to you quickly.
5.0 · 227 Google reviews
What happens next. An advisor reviews your request — the size, your city and its rules, site access — then emails you a clear quote. If you decide to book, we phone you. For an urgent delivery, call 514 708-2424.
Dumpster rental — or bin rental, as many Montrealers call it — for the big cleanout, an estate, a renovation or a demolition: dry materials, soil, concrete, bricks, asphalt and more.
14' long × 8' wide × 2.5' high · 3 to 4 pickup-truck loads
A 20-yard filled halfway: same footprint, just lower — choosing it won't free up space in a short driveway.
For guidance only — the exact size cannot be guaranteed.
14' long × 8' wide × 5' high · 6 to 8 pickup-truck loads
About the size of a Dodge Caravan — you can already picture it
20' long × 8' wide × 7' high · 12 to 16 pickup-truck loads
Our practical guide helps you choose the right size for your project — renovation, demolition, soil, concrete, bricks, asphalt — with the conditions and the FAQ.
Libération Express
Every rental includes 7 days — 15 for contractors. But if you work fast, our quick-release promotion rewards you:
More than 48 hours after delivery, the promotion no longer applies — your 7-day rental simply continues, without the credit.
Freeing up dumpsters sooner is also what lets us deliver faster everywhere in Rougemont — everyone wins.
Offer valid during the high season (March to October).
A full dumpster is heavy, and drop-off and pickup are when asphalt gets marked. Every Megabac dumpster arrives clean, safe and fitted with the exclusive PROTEC-O-SOL system: built-in planks that spread the load and protect your asphalt, concrete or paved driveway. Nothing to supply, nothing extra to pay.
Even with the planks, the dumpster is still a steel box. Before the truck arrives, lay down four flattened cardboard boxes — or a thin sheet of plywood — where the dumpster will sit: the steel never touches your asphalt or your pavers directly. Two minutes of prep, zero worries.
The price depends on the size, the type of materials, how long you keep it — and your area. The form above or a two-minute call is all it takes to get your exact price, fast. What makes up the price, in plain words → And if you free up the dumpster within 48 hours of delivery, the Libération Express credit applies — details below.
Size is not the whole story: dumpsters are rented by material type. Each type goes to a different disposal facility — that is why mixed loads bring extra fees. One choice to make, five options:

10, 20 and 40 cubic yards
The do-it-all dumpster: wood, drywall, metal, shingles, furniture — mixed, no problem.

20 yard — the only size offered
Excavation, grading, sod removal — soil, rocks and sod, nothing else.

20 yard — the only size offered
Walkways, slabs, foundations — broken concrete, nothing else.

20 yard — the only size offered
Walls, chimneys, masonry facing — bricks and mortar, nothing else.

20 yard — the only size offered
Old torn-up paving, curb pieces — asphalt, nothing else.
Why it matters. A dumpster rented for concrete that shows up at the disposal facility with wood in it is refused at the concrete rate: the sorting gets billed back. If you have several types of materials, say so in the form or at 514 708-2424 — we point you to the right type, or to two dumpsters when that costs less than sorting fees.
Tires
Paint, solvents, oils
Propane, aerosols, acidsNot for the dumpster itself, if it sits entirely on your land. We word it carefully because the conclusion comes from an absence of provision: the word « conteneur » appears nowhere in by-law 2018-248 on the application of the planning by-laws, nor in construction by-law 2018-244, nor in the urban plan, and the closed list of certificates of authorization in section 27 provides none for placing a container. Schedule A sets no such fee either. The job site, on the other hand, almost always needs a permit here: Rougemont sets no dollar threshold, section 47 covering « any project to install, build, repair, alter, enlarge or add buildings, or to excavate for that purpose ». In doubt about your case? The planning inspector answers at 450 469-3790, extension 233.
Not for a simple clean-out. The traffic by-law names the container and prohibits it on streets and public roads, « except for delivery purposes or for carrying out work » (by-law 2022-322, s. 18; 45 $ fine). So the exception exists — a real Rougemont particularity — but nothing states how long it lasts. Two texts close it partway: the nuisance by-law tolerates equipment or construction materials in a public place only « as part of work authorized by the municipality » (s. 32), and schedule A of the planning by-law prices a « Use of the street — 50 $ » that no section describes. We do not settle that in the municipality's place: call 450 469-3790, extension 233, before any drop-off on the street. In your driveway, on the other hand, there is nothing to apply for.
No — it is in fact the local norm: zoning expressly allows access lanes « covered with asphalt, gravel or masonry or granular materials », only parking areas of five spaces or more inside the urban perimeter having to be asphalted or paved (s. 137). On gravel, the question is not a scratch but the rut and the bearing capacity: every one of our dumpsters is delivered with the PROTEC-O-SOL system, built-in planks that spread the load. Nothing to supply, nothing extra to pay. Our drivers' tip for full protection: four flattened cardboard boxes, or a thin sheet of plywood, on the chosen spot before the truck arrives. Do tell us as well if the driveway carries a speed hump — zoning requires one at least 0.15 m high near the street where the slope of the lot calls for it (s. 89).
For a car trunk, yes — and the Rouville regional county's centre even accepts concrete, asphalt and brick, which many refuse. For a job site, the arithmetic settles it. A « counted visit » is worth « a volume equivalent to a trailer 4 feet X 8 feet X 16 inches high or less », that is 1.58 cubic yards; every address gets six free counted visits per calendar year, then 40 $ per additional visit. A whole year's six visits therefore come to 9.5 cubic yards — less than a single 10 yard dumpster, and a little under a quarter of a 40 yard. Add that vehicles of 4,500 kg GVWR and over are banned from the site, that a trailer's tipping mechanism may not be used, that everything is sorted and unloaded by hand, and that each trip means driving to Marieville or Saint-Césaire, three or four days a week. For reference: a 10 yard box holds 7.6 m³, a 20 yard 15.3 m³, a 40 yard 30.6 m³.
Yes, if your business is on the territory of the Rouville regional county — and that is a real difference from several municipal drop-off centres. The regional county writes: « the driver must have their own driver's licence and proof of the company (a copy of the year's tax bill or a copy of a recent invoice) », documents to be presented at every visit. The limits stay the same as elsewhere: the six-counted-visit quota is also calculated « according to the address […] of the place of business for institutions, businesses and industries », then it is 40 $ a visit; no vehicle of 4,500 kg GVWR and over, no tractor or heavy machinery, no tipping mechanism; and « large quantities of hazardous products, of specialized products and those coming from businesses are refused ». For a job site that moves, the arithmetic is quick.
No, and zoning is explicit on this point: « the use, in whole or in part, permanently or temporarily, of railway cars, buses, truck boxes, trailers, freight containers or other vehicles or objects of the same nature as a principal or accessory building or structure is prohibited » (by-law 2018-242, s. 83). The ban targets use as a building, not the presence of a waste dumpster during work — but it closes the door on keeping the box for storage. Two useful reminders in the same spirit: bulky waste not covered by collection « may not be left outside a building for more than forty-eight (48) hours » (by-law 2022-324, s. 5), and freeing the dumpster within 48 hours earns you the 50 $ Libération Express credit from March to October.
Yes — 94.5% of Rougemont's territory is farmland: out here the rang question comes up almost every time. Two things get checked on the phone rather than on site. First the slope: the urban plan notes that the municipality « occupies one third of Mont Rougemont », which gives « its somewhat rugged character to the area and to certain roads » — Rang de la Montagne and La Petite-Caroline run partly on the mountain. Then the driveway: out on a rang it often crosses a ditch on a culvert, and schedule A of planning by-law 2018-248 sets a fee for a « permis pour ponceau », with an inspection deposit: the municipality cares about those. Tell us the usable width and the state of the culvert, and we will pick the box accordingly. On site, two rules follow us everywhere: ditches and shoulders form part of the « public road » under the nuisance by-law (s. 3), and our truck must leave clean (s. 25).
And elsewhere? We checked the permit rule in every city we serve, by-law in hand — because it is never the same from one city to the next.
Check another city
We deliver to every neighbourhood in Rougemont — and we know the area.
In Rougemont the first question is not room, it is which Rougemont we are talking about. The urban plan puts numbers on the split: 4,205 hectares of farmland, or 94.5% of the territory, against 243 hectares of urban perimeter — 5.5%. In the village, small-town streets and driveways measured by zoning. Out on the rangs, ditches, culverts and shoulders. These are two delivery worlds in one municipality of 2,821 residents, and the question gets settled on the phone rather than in the driveway. What we ask then is short: the width of the access, the surface, and how the truck comes in. A Rougemont residential access lane is between 3 and 7 metres wide for one to four parking spaces; a single access is allowed when the frontage is 15 m or less, two beyond that, with a 6 m minimum between them (zoning 2018-242, s. 139 and 140). A 20 yard box, roughly the size of a Dodge Caravan, fits without trapping the car when the spot is chosen ahead. The 10 yard equals a 20 yard filled halfway: same footprint, simply lower.
The second thing is the surface — and here it changes the advice. Rougemont expressly allows gravel: « all parking surfaces and access lanes must be covered with asphalt, gravel or masonry or granular materials, so as to eliminate any dust lift and any formation of mud » (s. 137). Only parking areas of five spaces or more inside the urban perimeter must be asphalted or paved. On a gravel driveway the risk is not a scratch, it is the rut and the bearing capacity under the legs and the rear axles. That is exactly what the PROTEC-O-SOL system is for, and it comes with every box — built-in planks that spread the load. Nothing to supply, nothing extra to pay. Two points of geometry round out the manoeuvre: where the slope of the lot requires it, the access lane carries a speed hump at least 0.15 m high near the street to redirect runoff (s. 89), and on a corner lot the visibility triangle of 7.5 m — 10 m if one of the streets exceeds 50 km/h — bars anything over one metre tall, a provision that « takes precedence over any other provision of this by-law » (s. 107).
The third is the terrain. Rougemont « occupies one third of Mont Rougemont », its urban plan writes, which gives « its somewhat rugged character to the area and to certain roads » — Rang de la Montagne and La Petite-Caroline run partly on the mountain, among the orchards and vineyards that earn the municipality its title of apple capital. Our drivers look at slope and usable width there before they look at the truck's angle. Three clearances apply everywhere, village or rang: the nuisance of obstructing a fire hydrant within 1.80 metres (by-law 2022-324, s. 31), the free metre the regional county requires between collection bins and any object that cannot be moved (by-law 333-23, s. 4.4), and the instruction the municipality repeats for all three bins: « the bin must be placed in your driveway and NOT in the street ». So the dumpster shares the driveway with the bins on collection days, and that gets placed when you book.
Rougemont's urban perimeter fits into 243 hectares, and the urban plan breaks it down, roadways excluded: residential 48%, services 18.1%, industrial 17.3%, culture 11.3%, transport 2.8%, commercial 1.8%. Industry weighs visibly on that perimeter, and the plan names the three companies that occupy it: Vins Arterra Canada, Industries A. Lassonde and Transport Robert — A. Lassonde being « the municipality's largest employer with more than 50% of the jobs ». A sizeable area is in fact held in reserve for its eventual expansion, in the block formed by Rue Principale, Chemin du Contour, Rue Amédée-Côté and 5e Avenue. Our rotations are built around that: 40 yard dumpsters for job sites that move, photo tracking of every delivery, SMS notifications on drop-off and pick-up, and flexible pick-up as your work progresses.
The Rougemont market is not one of new construction, and the municipality writes so itself: it « faces a saturation of the land available for residential development », the remaining lots being « often isolated vacant lots whose owners are not interested in selling or building ». Volume therefore comes from renovating the existing stock, from clean-outs, and from farm and industrial job sites. Two rules weigh heavily on those sites. First, the building permit has no dollar threshold in Rougemont: « any project to install, build, repair, alter, enlarge or add buildings, or to excavate for that purpose, is prohibited without first obtaining a building permit » (by-law 2018-248, s. 47). Second, what comes out of the ground cannot go back into it: excavating and backfilling requires a certificate of authorization (s. 27 b), and the only backfill materials allowed are « soil, sand, gravel and rock », zoning « strictly » prohibiting for that purpose « dry or contaminated materials (paving, curbing, etc.), as well as wood and other construction materials » (s. 108 and 167). Old asphalt and old concrete must leave the property — which is precisely what our single-material dumpsters are for.
Three local details we factor in by default. Noisy work is allowed Monday to Friday from 7 a.m. to 9 p.m., and on Saturday and Sunday only from 8 a.m. to 5 p.m. — the nuisance by-law prohibits it outside those windows (s. 21), with two exceptions: emergency work and farm work. A weekend that closes at 5 p.m. changes a job site's arithmetic, and therefore the delivery time. The truck, next, does not leave as it pleases: the owner of a lot « from which vehicles emerge whose tires, mudguards, body or load box are soiled » must clean them and prevent them from reaching the public road (s. 25); and leaving a container « whose contents scatter […] for lack of being securely fastened, covered or watertight » is a prohibited nuisance (s. 26). That is why our boxes leave tarped. Finally, the 50 $ Libération Express credit rewards fast job sites: it applies when the dumpster is freed up within 48 hours of delivery, during the March-to-October high season.
In Rougemont the street closes at night, but not every night. Parking is prohibited on public roads from December 1 to March 15 inclusive, between midnight and 7 a.m. (by-law 2022-322, s. 16, as amended by by-law 2024-362 in force February 22, 2024). Schedule V adds the nuance that matters: the ban « is lifted when no snow-clearing operation is planned », at the public works department's discretion — operations covering « piling, blowing, loading, hauling snow, spreading salt or abrasives, clearing catch basins ». A vehicle left there during a ban period faces a fine and towing at its owner's expense: the by-law prices towing at 100 $ and storage at 10 $ per day or part of a day (s. 6 and 7). So the street is no fallback between December and mid-March, and the spot gets reserved in the driveway.
What really changes is how crowded that driveway gets. A temporary car shelter is allowed from October 15 to April 15 — « outside that period the shelter, frame included, must be dismantled » — barred from the space directly in front of the façade unless it stands on the access lane or the parking spaces, at least 2.5 m from the paved roadway, 1 m from the side and rear lot lines and 1.5 m from a fire hydrant, no taller than 2.5 m and no larger than 30 m² (zoning 2018-242, s. 126). It stands exactly where the dumpster would go, six months a year. Add the snow, which cannot take the street: throwing or depositing snow or ice from private land in a public place is a prohibited nuisance, and « the owner or occupant of any building from which that snow or ice comes is presumed to have allowed its deposit in the prohibited place » (by-law 2022-324, s. 27). Liability stays with the owner, even when it is the contractor holding the blower.
Then comes the waste calendar, which decides what the driveway still has to hold. From November to March, garbage collection comes only every 3 weeks — January, February, March, November and December — and organic waste every 2 weeks; recycling stays every 2 weeks year-round. Bins go out no earlier than 7 p.m. the night before and must be taken in within 12 hours of a collection that runs between 7 a.m. and 7 p.m. (by-law 333-23, s. 4.5 to 4.7). On the drop-off side, winter closes doors too: the Saint-Césaire centre is closed as of November 15, 2026 and the Marieville one drops to Thursday through Saturday. Four months a year, a Rougemont driveway must therefore hold the snow pushed to either side, the bins on a longer cycle, often the car shelter — and the dumpster. That gets planned when you book.
Rougemont has no drop-off centre of its own. The Rouville regional county declared jurisdiction over waste management and runs two regional drop-off centres for its eight municipalities: Marieville, 135 chemin du Ruisseau Saint-Louis Est (Route 227), and Saint-Césaire, 275 Route 112. Access is reserved for residents of the regional county, on presentation of photo ID showing an address, with mandatory registration at the gate — and, notably, businesses based in the territory are admitted. For a car trunk, it is the right address. Here is where the door closes.
| The rule | What it means for a job site |
|---|---|
| Six free visits, then 40 $ | Drop-offs of construction, renovation and demolition waste are counted by address from January 1 to December 31; « after six (6) counted visits […] a fee of 40 $ per additional visit will be charged » |
| One visit = a 4 ft × 8 ft × 16 in trailer | That is 1.58 cubic yards. Beyond it, « the load will count as 2 counted visits or more », assessed on arrival |
| A whole free year comes to 9.5 cubic yards | Six counted visits is slightly less than a single 10 yard dumpster — and a 20 yard works out to about 12.7 visits |
| Concrete, asphalt and brick accepted, but counted | Asphalt, concrete, reinforced concrete, brick, cement, masonry, mortar, paving stone, cement slabs, plaster, gravel, stone, rock and sand all fall among the counted materials |
| Nothing over 4,500 kg | Vehicles of 4,500 kg GVWR and over, tractors and heavy machinery are banned, and « it is strictly prohibited to use the tipping mechanism » of a vehicle or a trailer |
| Everything is sorted and unloaded by hand | « Sort your materials by category », closed bags « will have to be opened and sorted », you must allow time for unloading and « arrive 30 minutes before closing » |
| Three or four days a week, one site in winter | Marieville: Wednesday to Saturday, 9 a.m. to 4:30 p.m. until October 31, 2026, then Thursday to Saturday. Saint-Césaire: Thursday to Saturday, closed as of November 15, 2026 |
| Stumps, roots and contaminated soil refused | As are household garbage, manure and sludge, asbestos and fire residues; « the regional county reserves the right to refuse any material » |
At the curb, the fallback is thinner still. By-law 333-23 of the regional county formally prohibits in garbage « soil, peat, rubble and plaster debris, pieces of concrete or masonry and chunks of pavement », wood in general and « materials from construction, renovation or demolition (CRD) activities of residential or ICI origin » (s. 5.2). The bulky waste collection runs just three times a year across the regional county, online registration is mandatory, and its very definition excludes « construction, renovation and demolition (CRD) waste or dry materials » (s. 2.2, 13°). Meanwhile Rougemont's nuisance by-law prohibits leaving construction debris on a lot (s. 5) as well as piles of soil, gravel, sand or crushed stone (s. 6), and zoning prohibits burying them on site (s. 108). All three municipal doors close at once. Volume markers: a 10 yard box holds 7.6 m³, a 20 yard 15.3 m³, a 40 yard 30.6 m³. Info-collectes settles the odd case at 450 693-2326.
Municipality of Rougemont, « Collectes de matières résiduelles et écocentre » page; MRC de Rouville, by-law 333-23 on waste management (s. 1.2, 2.2, 13°, 4.3 to 4.7 and 5.2), by-law 335-23 on the declaration of jurisdiction, and the « Écocentres », « Liste des matières acceptées et refusées », « Matières acceptées mais comptabilisées par visite », « Matières acceptées gratuitement de façon illimitée », « Matières refusées » and « Info-collectes » pages — consulted August 20, 2026. Hours and quotas come from the regional county, which keeps them current: the municipality's own page still shows the 2023 hours.
Call us for fast, friendly, professional service — or fill out the form and we'll get back to you with the right size and the price.