Why only one size for concrete?
Because weight caps out before volume: at about one ton per cubic yard, a big dumpster would be over the road limit long before it was full. The 20 yard filled three quarters is the size that goes out — whatever your project's volume, it is the number of trips that adjusts.
How many tons are included?
7 tons are included in the price, and a trip leaves at 12 tons maximum. In between, each additional ton is prorated from the disposal centre's weigh ticket — your load's real weight, never rounded.
Is reinforced concrete accepted?
Yes, no problem: reinforced concrete goes in with its rebar and mesh — nothing to separate on your end. That is confirmed policy, not a case-by-case tolerance.
Can I put a little soil in with the concrete?
No — and it is your invoice we are protecting: a single-material dumpster takes only its material, any mixing brings sorting fees. Soil has its own dumpster; if your project produces both, we plan two boxes or two trips.
Why not fill the dumpster all the way?
The truck's legal load is reached well before the rim: a concrete dumpster filled to the top would never leave your driveway. Loading stops at three quarters — 45 inches from the floor — the benchmark our drivers give on every jobsite.