Skip to content
Megabac Environnement — dumpster rental
20 yard Megabac dumpster delivered on a Montreal jobsite

Soil, rocks and sod dumpster rental — billed by weight

A soil dumpster does not rent like a renovation dumpster: weight decides, not volume. One size goes out — the 20 yard, 7 tons included, 12 maximum — filled three quarters at most, never more: the truck's legal load is reached well before the rim. Enter your dig's dimensions below: the tool returns your tons and the number of trips.

Why this dumpster is billed by weight

A stripped flower bed looks like nothing, wheelbarrow after wheelbarrow. In the dumpster it is another story: soil, rocks and sod weigh about one ton per cubic yard — far above a renovation dumpster that fills with wood and drywall. That is why soil never goes into the mixed dry materials box, and why the rental is not billed by volume.

One size goes out: the 20 yard. The price covers 7 tons included, 12 tons maximum; each additional ton is prorated from the disposal facility's weigh ticket — real weight, never rounded. And the box fills three quarters at most (45 inches from the floor): the truck's legal load is reached well before the rim. The rule holds for the whole family — concrete, asphalt, bricks and mortar — and the why behind the separate dumpster is on the blog.

The contaminant that matters most here is not chemical at all: it is Japanese knotweed. In Quebec it reproduces almost entirely from rhizome fragments, and hauling excavated soil is one of its main vectors — a single piece of root is enough. If your property carries it, the government's recommendation is not to reuse that soil: bury it on site at roughly two metres, or send it to an authorized site. Tell us before delivery; it changes where the load goes, not what you pay. Rocks take a different road from concrete and brick: crushed, they become natural aggregate, outside the standard that governs recycled materials.

How much does the excavation weigh, how many trips?

Measure the area you are stripping or the trench you are digging: the tool converts to cubic yards, then tons, and tells you whether one dumpster is enough.

Measure the real stripping depth: 3 to 4 inches for sod, a good deal more for a trench. Soaked soil weighs appreciably more than dry soil. The result is approximate — the weight that counts is the one on the scale ticket.

Enter the excavation dimensions — the calculation appears here.

Site rule of thumb: soil, rocks and sod run about one ton per cubic yard — and that figure climbs with the rain. Sod is organic matter: it holds water and it ferments, so it does not sit in storage.

What goes into the soil, rocks and sod dumpster

A single-material dumpster takes that material only: any mixing brings sorting fees. Here the material bears three names — soil, rocks, sod — and that is all the box accepts.

Yes — soil, rocks and sod, nothing else

  • Excavated soil — redone flower bed, trench, hand-dug pool
  • Dug-out rocks and backfill stone — backfill goes too
  • Sod torn out in strips — it goes in with its soil, nothing to separate
  • Roots that come up with the soil: accepted, nothing to separate

No — this stays out

  • Concrete “while we're at it”: it has its own dumpster, and so does asphalt — any mixing brings sorting fees
  • Bricks and mortar: same logic, their own 20 yard
  • Stumps: never here, and neither are branches — the mixed dry materials dumpster takes them
  • Wood, drywall, metal: that is the mixed dry materials dumpster
  • The refused-everywhere items: tires, oils, paints, solvents, aerosols, propane tanks

How it unfolds, no surprises

From the call to the scale ticket: what soil changes at every step.

  1. We confirm the size, the date and what the soil is A two-minute call: your dimensions, our calculation, the exact price. Tell us whether the property carries Japanese knotweed, and whether the soil has been disturbed before — where the load goes depends on it. Delivery Monday to Friday, generally between 6:30 a.m. and 3 p.m.
  2. The bin arrives, your driveway is protected PROTEC-O-SOL planks included under the bin. Load with the bucket, without packing it down: packed soil reaches the weight faster than the box fills. Three-quarters full at most — the 45-inch mark is inside the box.
  3. Weighed at the disposal facility, invoiced on real weight The scale ticket is what counts: 7 tons included, the additional ton pro rata, never rounded up. Where it goes depends on what the soil carries: clean soil and knotweed-infested soil do not end up in the same place.

Any doubt while loading — knotweed, a smell of hydrocarbons, fill of unknown origin? Call before the truck leaves: thirty seconds on the phone costs less than sorting at the disposal facility.

Government of Quebec, Japanese knotweed fact sheet (invasive alien species); BNQ 2560-600 standard (2024), which covers recycled aggregates made from concrete, asphalt mix and brick.

Free quote

It takes a minute — and the team gets back to you quickly. Fields marked with an asterisk (*) are required.

5.0 · 228 Google reviews

What happens next: we email you the quote — exact price and possible date. Have your dimensions handy — length, width, depth: that is all it takes to get the math right.

Excavation jobsite questions

Why can't soil go in the mixed dumpster?

Because it weighs about one ton per cubic yard — a renovation dumpster fills with wood and drywall, not with a material that reaches the truck's legal load at half height. Soil, rocks and sod have their own 20 yard; any mixing brings sorting fees, and it is your invoice we are protecting.

Does wet soil weigh more?

Yes — rain makes a load heavier, and the disposal facility's weigh ticket is what counts: real weight, never rounded, in either direction. Hence the point of loading in dry weather when the jobsite allows it, and covering the pile if you can. The math itself never changes: 7 tons included, the rest prorated from real weight.

Is sod torn out in strips accepted?

Yes — the material bears its name: soil, rocks AND sod. Torn-out strips go in with their soil, nothing to separate on your end. What is not accepted by default: stumps and branches — one call confirms it before you load.

How many tons are included?

7 tons are included in the price, and a trip leaves at 12 tons maximum. In between, each additional ton is prorated from the weigh ticket — your load's real weight, never rounded. Past 12 tons, we simply plan a second trip.

Why stop at three quarters of the box?

Because the truck's legal load is reached well before the rim: at about one ton per cubic yard, a 20 yard full of soil would never leave your yard. Loading stops at 45 inches from the floor — the mark is inside the box, and our drivers repeat it on every jobsite.

Pile already growing on the lawn?

A two-minute call gives you the exact price, the number of trips and the date. We do the math with you.