The brick wall being redone, the chimney being dismantled, the masonry veneer being stripped: it all ends up in a pile that looks harmless on the ground. It is not: bricks and mortar weigh about one ton per cubic yard — the same order as concrete and soil, far above a renovation dumpster that fills with wood and drywall. That is why masonry never goes into the renovation box, and why the rental is not billed by volume.
One size goes out: the 20 yard. The price covers 7 tons included, 12 tons maximum; each additional ton is prorated from the disposal facility's weigh ticket — real weight, never rounded. And the box fills three quarters at most (45 inches from the floor): the truck's legal load is reached well before the rim. Concrete, soil and asphalt follow the same logic: each gets its own dumpster, each its own weigh ticket. Whether you are rebuilding a wall, dismantling a chimney or stripping a veneer, it is the number of trips that adjusts — never the size.
Masonry does not come down like a slab, and that is not a matter of preference: Quebec's Safety Code for the construction industry requires that masonry demolition “be carried out in approximately level courses and not in masses.” A wall comes down course by course. That is why a façade takes days where a slab takes hours — and why the bin stays with you longer. Two things do not follow clay brick: the mortar, which the ministry lists among brick's impurities, and the firebrick from a fireplace or hearth, excluded from the brick recovery stream and sent to a different regime. Pull the firebrick out before you load.