In Saint-Jérôme, Megabac Environnement delivers dumpsters across the whole territory: three sizes for mixed dry materials — 10, 20 or 40 cubic yards — plus four single-material dumpsters: soil-rock-sod, concrete, brick and mortar, asphalt. PROTEC-O-SOL planks are included and protect the driveway. Same-day delivery when available. One call to 514 708-2424 gives you the size, the price and the date.
Super compagnie !! Très bon service ! Ponctuel et courtois, je vous le recommande fortement !
Excellente expérience du début à la fin. Service rapide, professionnel et très efficace. Je recommande fortement.
Super service! Le conteneur est arrivé comme prévu et un prix très raisonnable. Jonathan répond toujours au téléphone. Service à la clientèle impeccable!
J'ai loué un conteneur à déchets pour des rénovations, et tout s'est déroulé super bien. Ils sont vraiment professionnels, rapides, et je les recommande à 100 %.
It takes a minute — and the team gets back to you quickly.
5.0 · 227 Google reviews
What happens next. An advisor reviews your request — the size, your city and its rules, site access — then emails you a clear quote. If you decide to book, we phone you. For an urgent delivery, call 514 708-2424.
Dumpster rental — or bin rental, as many Montrealers call it — for the big cleanout, an estate, a renovation or a demolition: dry materials, soil, concrete, bricks, asphalt and more.
14' long × 8' wide × 2.5' high · 3 to 4 pickup-truck loads
A 20-yard filled halfway: same footprint, just lower — choosing it won't free up space in a short driveway.
For guidance only — the exact size cannot be guaranteed.
14' long × 8' wide × 5' high · 6 to 8 pickup-truck loads
About the size of a Dodge Caravan — you can already picture it
20' long × 8' wide × 7' high · 12 to 16 pickup-truck loads
Our practical guide helps you choose the right size for your project — renovation, demolition, soil, concrete, bricks, asphalt — with the conditions and the FAQ.
Libération Express
Every rental includes 7 days — 15 for contractors. But if you work fast, our quick-release promotion rewards you:
More than 48 hours after delivery, the promotion no longer applies — your 7-day rental simply continues, without the credit.
Freeing up dumpsters sooner is also what lets us deliver faster everywhere in Saint-Jérôme — everyone wins.
Offer valid during the high season (March to October).
A full dumpster is heavy, and drop-off and pickup are when asphalt gets marked. Every Megabac dumpster arrives clean, safe and fitted with the exclusive PROTEC-O-SOL system: built-in planks that spread the load and protect your asphalt, concrete or paved driveway. Nothing to supply, nothing extra to pay.
Even with the planks, the dumpster is still a steel box. Before the truck arrives, lay down four flattened cardboard boxes — or a thin sheet of plywood — where the dumpster will sit: the steel never touches your asphalt or your pavers directly. Two minutes of prep, zero worries.
The price depends on the size, the type of materials, how long you keep it — and your area. The form above or a two-minute call is all it takes to get your exact price, fast. What makes up the price, in plain words → And if you free up the dumpster within 48 hours of delivery, the Libération Express credit applies — details below.
Size is not the whole story: dumpsters are rented by material type. Each type goes to a different disposal facility — that is why mixed loads bring extra fees. One choice to make, five options:

10, 20 and 40 cubic yards
The do-it-all dumpster: wood, drywall, metal, shingles, furniture — mixed, no problem.

20 yard — the only size offered
Excavation, grading, sod removal — soil, rocks and sod, nothing else.

20 yard — the only size offered
Walkways, slabs, foundations — broken concrete, nothing else.

20 yard — the only size offered
Walls, chimneys, masonry facing — bricks and mortar, nothing else.

20 yard — the only size offered
Old torn-up paving, curb pieces — asphalt, nothing else.
Why it matters. A dumpster rented for concrete that shows up at the disposal facility with wood in it is refused at the concrete rate: the sorting gets billed back. If you have several types of materials, say so in the form or at 514 708-2424 — we point you to the right type, or to two dumpsters when that costs less than sorting fees.
Tires
Paint, solvents, oils
Propane, aerosols, acidsNot for the dumpster itself, if it sits entirely on your land. Better still: for a job covered by a permit, construction by-law 0354-000 allows it expressly in section 46 — “Temporary waste containers are permitted in all yards, for the duration of the permit's validity.” For a simple clear-out with no work, the conclusion comes from an absence of provision: the list of certificates of authorization in by-law 0355-000 is closed and covers no such case, and schedule 19 of fee by-law 0774-000 sets no charge for it. The job site, however, often does need a permit — not from a dollar amount, but according to the nature of the work. In doubt? Centrale du citoyen, 450 569-5000, Monday to Friday from 8 a.m. to 5 p.m.
It is possible in Saint-Jérôme — but only if you have no room on your own land, and the city is the one who writes it: “Temporary occupancy of public property may be authorized only if the applicant demonstrates that they do not have sufficient space on their private property for the intended occupancy” (by-law 0366-000, s. 16, which names containers). You then need a certificate of authorization from the planning and sustainable development department, photos of the site beforehand, a scale plan, liability insurance of at least $3,000,000, a security deposit of at least $500 and flashing lights from sunset to sunrise. The “Emprise de rue” page posts $10 per parking space per day, minimum $50 — have it confirmed at 450 569-5000, as the city publishes more than one grid — and notes that “a waste container takes up the space of two (2) parking spaces”. More often than not, the driveway is simpler, faster, and free of municipal fees.
Yes, and section 46 of construction by-law 0354-000 says so in plain words: it is prohibited “to burn or bury unused debris or materials on site”, and those materials “must be stored in appropriate containers or transported to an authorized site or a material recycling site within 30 days following the end of the work”. Nuisance by-law 0209-000 adds in section 3 that leaving “demolition debris” or “waste” on or in any building “constitutes a nuisance and is prohibited”, and the city's “Propreté” page lists demolition or construction debris among the prohibited undesirable items. The fine starts at $300 for an individual and $500 for a corporation, and each day counts as a separate offence.
A new requirement, and a distinctly Saint-Jérôme one. Since June 17, 2026, section 8.2.1 of by-law 0887-000 requires “any residential, institutional, commercial or industrial owner or any contractor filing an application for a construction, renovation or demolition permit” to complete a CRD waste management plan supplied by the city, to be sent in within 60 days of receiving the permit. Section 8.2.4 lets the city require, at any time, proof of disposal or recovery — “invoices, receipts, transport manifests, weigh tickets, etc.” — and inspect the job site. A rented dumpster leaves a named invoice, a job-site address, a date and a destination: useful proof to keep, even though the city does not name it as mandatory. For the exact form and the steps to follow, call the Centrale du citoyen at 450 569-5000.
For a car trunk, yes — and it takes more than most: asphalt, asphalt shingle, concrete, wood, brick, gypsum and composite melamine all go through. For a job site, no. A resident gets 2 m³ free per year, an annual total and not per visit, then pays $50 per cubic metre, with a 0.5 m³ minimum per visit. Soil and gravel are refused at every drop-off centre in the regional county, as are branches, stumps and logs. “Unloading the materials is your responsibility”, the holder of the address must be present at drop-off, and the site closes Sunday and Monday year-round, opening 9 a.m. to 4:30 p.m. with a last entry at 4:15 p.m. The arithmetic is quick: a 10-yard box holds 7.6 m³, a 20 yard 15.3 m³, a 40 yard 30.6 m³.
No, and the city writes it in capitals: “NO CRD WASTE from a construction, renovation or demolition contractor will be accepted.” Accepted debris “must come only from renovations carried out by residents”, ID in hand. No contractor rate appears anywhere else in the regional county's fee grid: here there is no ambiguity to untangle. By-law 0887-000 states in section 8.2 that beyond one cubic metre dry materials go to the drop-off centre “or are sent to a private dry materials management service”, and section 2.2.1 adds that one may “award a contract to a company by one's own means, at one's own expense”. That is exactly the service we provide.
Not since August 2024 if the building has 13 units or more. By-law 0887-000, s. 6.2, then requires the owner to sign a service agreement with the operator of the drop-off centre and set aside space on private land, “or arrange private collection”. For other buildings the monthly bulky waste collection is still offered, but it refuses construction, renovation and demolition waste by name, along with doors and windows, mirrors and any material over 1 m³, with a maximum of 6 items or bundles totalling 2 m³ per dwelling, 2.5 m long and 100 kg per piece. Clearing out a unit or renovating a block passes those limits on day one: it is a dumpster, or a service agreement.
Not at the head of the driveway. Snow-clearing by-law 0465-000, section 4, allows “city employees or the contractors it has retained” to “throw, blow or place the snow covering a public road onto an adjoining private lot”: the front strip of your land receives the street's snow. The street itself is closed overnight, from midnight to 7 a.m., from November 15 to April 1. And the temporary car shelter, allowed from October 15 to April 15, already takes up the parking area or the access lane. So we choose the winter spot together when you book — allowing for your bins, which the by-law wants “outside the snow-clearing zone” and never in the street or on the sidewalk.
Every one of our dumpsters is delivered with the PROTEC-O-SOL system, built-in planks that spread the load and protect the surface. Nothing to supply, nothing extra to pay. In Saint-Jérôme the question comes in two forms. In urban neighbourhoods zoning requires asphalt, concrete, concrete pavers, grass-celled concrete pavers or reinforced turf: the worry is a mark on the surface, and our drivers' tip is to lay four flattened cardboard boxes, or a thin sheet of plywood, on the chosen spot before the truck arrives. In the peri-urban residential, rural agricultural, rural residential, village mixed and village residential designations, where gravel is allowed, the worry becomes ruts and bearing capacity at spring thaw: tell us when you book and the truck goes about it differently.
And elsewhere? We checked the permit rule in every city we serve, by-law in hand — because it is never the same from one city to the next.
Check another city
We deliver to every neighbourhood in Saint-Jérôme — and we know the area.
We deliver everywhere in Saint-Jérôme, from Bellefeuille to downtown, and the truck plans its move before it arrives. Three things get settled on the phone rather than in the driveway: slope, width and the corner lot. Saint-Jérôme zoning allows up to a 15% slope on any hard surface — driveway entrance, access lane, parking area — and that is a lot: on those driveways, where the truck stands and how the box comes down get discussed when you book. Driveway entrances are limited to one per street, two only for a lot more than 30 metres wide, and the parking area must stay 0.3 metre from a lot line. A 20-yard box, roughly the size of a Dodge Caravan, fits without trapping the car when the spot is chosen ahead. The 10 yard equals a 20 yard filled halfway: same footprint, simply lower.
The second thing our drivers check in Saint-Jérôme is the corner lot. Zoning imposes a sight triangle 6 metres on each side where the streets meet, which must stay “free of any obstacle higher than 0.7 metre” — planting, sign, fence, low wall, snow pile, landscaping object. A dumpster, even a 10 yard, is well above that height. On a Saint-Jérôme corner, it is not the available room that decides the spot, it is the triangle. We know it before we leave, and we tell you when you book rather than once the truck is there.
The third is the surface — and Saint-Jérôme has two. In urban neighbourhoods the parking area must be asphalt, concrete, concrete pavers, grass-celled concrete pavers or reinforced turf: that is exactly what the PROTEC-O-SOL system is for, and it comes with every box — built-in planks that spread the load. Nothing to supply, nothing extra to pay. But the same by-law allows gravel in the peri-urban residential, rural agricultural, rural residential, village mixed and village residential designations — the edge of the urban perimeter and the Vieux-Bellefeuille village core. There the worry is no longer a mark on the surface but ruts and spring thaw bearing: tell us on the phone and the truck goes about it differently. Our drivers' tip for a paved driveway: four flattened cardboard boxes or a thin sheet of plywood on the chosen spot, before the truck arrives.
Saint-Jérôme is the regional capital of the Laurentians and the 15th largest city in Québec: about 82,000 residents in 2023 according to the City of Saint-Jérôme, up 7.9% since 2016 against a provincial average of 4.1%, with 37,375 dwellings and 2,312 businesses. Its urban and sustainable mobility plan projects 96,125 residents by 2041 and puts the gentle-densification potential of single-family neighbourhoods at nearly 1,000 dwellings, in the form of accessory dwelling units. Translated into job sites: hundreds of additions and basements inside existing housing stock. Our rotations are built around that — 40-yard dumpsters for job sites that move, photo tracking of every delivery, SMS notifications on drop-off and pick-up, flexible pick-up as the work progresses. The $50 Libération Express credit rewards fast job sites: it applies when the dumpster is freed up within 48 hours of delivery, during the March-to-October high season.
For a contractor, Saint-Jérôme is blunter than most. The drop-off centre page says it in capitals: “NO CRD WASTE from a construction, renovation or demolition contractor will be accepted.” Accepted debris “must come only from renovations carried out by residents”, ID in hand, and no contractor rate appears anywhere else in the regional county's fee grid: this segment has no municipal route here. For a property manager, the city settles it too: since August 2024, municipal bulky waste collection no longer serves buildings of 13 units or more, whose owners “must sign a service agreement” with the operator of the drop-off centre and set aside space on private land, “or arrange private collection”. We take that mandate, with a contract on file if the city asks for it.
One last point, two months old: since June 17, 2026, any owner or contractor filing an application for a construction, renovation or demolition permit must complete a CRD waste management plan, to be sent in within 60 days of receiving the permit. The city may at any time require “invoices, receipts, transport manifests, weigh tickets” and inspect the job site. A rented dumpster leaves a named invoice, a job-site address, a date and a destination: useful proof to keep, even though the city does not name it as mandatory. One final local detail: crushing stone and concrete is allowed only for the duration of the permit, to reuse the material on the site itself, Monday to Friday from 7 a.m. to 5 p.m., and crushing material “from another site” is prohibited. Concrete, asphalt and brick must therefore leave the lot — exactly what a single-material dumpster does.
In Saint-Jérôme one snow-clearing rule changes everything for a dumpster, and it is written in plain terms: “city employees or the contractors it has retained may throw, blow or place the snow covering a public road onto an adjoining private lot”. That is not a figure of speech. A dumpster set at the head of the driveway in January sits right in the path. It is the first thing we discuss for a winter delivery: we back the box further in, or we move the date.
The street is no fallback either. Overnight parking is banned there from midnight to 7 a.m. — the city's snow page sums up the period as November 15 to April 1, and the by-law splits it into three exact windows: November 15 to December 23, December 27 to 30, then January 3 to April 1 inclusive. During loading operations the city puts up orange signs and warns that “tow trucks will precede the snow-clearing crews”. With more than 400 km of streets and 130 km of sidewalks to clear, the crews do not go around.
That leaves how crowded the driveway gets. A temporary car shelter is allowed from October 15 to April 15, two at most per lot, no taller than 3.5 metres, installed “in the parking area or in the access lane”, at least 1.5 metre from the sidewalk, the curb and the paving, and in the front yard only if it is perpendicular to the street. It stands exactly where the dumpster would go. Add the bins — which the by-law wants “outside the snow-clearing zone” during snowfall, on a cleared spot, never in the street or on the sidewalk — and the snow itself, which may not be pushed onto the public road, a written warning coming before any ticket. Six months a year, a Saint-Jérôme driveway must hold the street's snow, the bins, sometimes the car shelter, and the dumpster. That gets planned when you book.
Saint-Jérôme hosts the regional drop-off centre of the La Rivière-du-Nord regional county, at 220 boulevard Maisonneuve. Opened on May 26, 2021, “five times bigger than the old one”, it covers 20,000 m² and is the only one of the county's four drop-off centres open year-round. Hours are 9 a.m. to 4:30 p.m., last entry 4:15 p.m., closed Sunday and Monday. For a car trunk it is the right address — and it takes materials many drop-off centres refuse. Here is where the door closes.
| The rule | What it means for a job site |
|---|---|
| 2 m³ free per YEAR, not per visit | Beyond that: $50 per cubic metre, with a minimum of 0.5 m³ per visit |
| Soil and gravel refused | Refused at every drop-off centre in the regional county, along with branches, stumps and logs |
| Concrete, asphalt and brick accepted | Along with asphalt shingle, wood, gypsum and composite melamine — Saint-Jérôme and Sainte-Sophie are the county's only two centres taking CRD waste |
| No contractor CRD waste, in capitals | “NO CRD WASTE from a construction, renovation or demolition contractor will be accepted” |
| Everything is unloaded by hand | “Unloading the materials is your responsibility”, closed shoes required, and the holder of the address must be present at drop-off |
| Closed 2 days out of 7, year-round | Sunday and Monday; otherwise 9 a.m. to 4:30 p.m., last entry 4:15 p.m. — the county calendar governs, 450 569-0451 |
At the curb the fallback is thin. Curbside collection refuses by name “waste from construction, stumps and tree trunks, branches more than 10 cm in diameter, stones, and soil”, and “users must see to its removal themselves”. The monthly bulky waste collection refuses construction, renovation and demolition waste as well as any material over 1 m³, with a maximum of 6 items or bundles totalling 2 m³ per dwelling, 2.5 m long and 100 kg. The wheeled garbage bin, which the city does not supply, is limited to one per dwelling — five per building — and “materials placed beside the bins are not collected”. What remains is what by-law 0887-000 states in section 8.2: beyond one cubic metre, less than a third of a 10-yard box, dry materials go to the drop-off centre “or are sent to a private dry materials management service”. Conversions: a 10-yard box holds 7.6 m³, a 20 yard 15.3 m³, a 40 yard 30.6 m³.
City of Saint-Jérôme, “Écocentre”, “Résidus de construction, de rénovation et de démolition (CRD)”, “Déchets”, “Encombrants” and “Collectes” pages, opening news release of May 26, 2021, by-law 0887-000 on waste management (s. 2.2.1, 4.1, 4.2, 6, 6.2, 7.2, 8.1, 8.2, 8.2.1, 8.2.2, 8.2.4 and 10); La Rivière-du-Nord regional county, drop-off centres page, CRD and bulky waste fee grid, 2026 accepted and refused materials sheet and 2026 calendar — consulted August 19, 2026.
Call us for fast, friendly, professional service — or fill out the form and we'll get back to you with the right size and the price.