In Mirabel, Megabac Environnement delivers dumpsters across all 13 sectors: three sizes for mixed dry materials — 10, 20 or 40 cubic yards — plus four dumpsters reserved for a single material: soil-rock-sod, concrete, brick and mortar, asphalt. PROTEC-O-SOL planks are included and protect your driveway. One call to 514 708-2424 gives you the size, the price and the date.
Super compagnie !! Très bon service ! Ponctuel et courtois, je vous le recommande fortement !
Excellente expérience du début à la fin. Service rapide, professionnel et très efficace. Je recommande fortement.
Super service! Le conteneur est arrivé comme prévu et un prix très raisonnable. Jonathan répond toujours au téléphone. Service à la clientèle impeccable!
J'ai loué un conteneur à déchets pour des rénovations, et tout s'est déroulé super bien. Ils sont vraiment professionnels, rapides, et je les recommande à 100 %.
It takes a minute — and the team gets back to you quickly.
5.0 · 227 Google reviews
What happens next. An advisor reviews your request — the size, your city and its rules, site access — then emails you a clear quote. If you decide to book, we phone you. For an urgent delivery, call 514 708-2424.
Dumpster rental — or bin rental, as many Montrealers call it — for the big cleanout, an estate, a renovation or a demolition: dry materials, soil, concrete, bricks, asphalt and more.
14' long × 8' wide × 2.5' high · 3 to 4 pickup-truck loads
A 20-yard filled halfway: same footprint, just lower — choosing it won't free up space in a short driveway.
For guidance only — the exact size cannot be guaranteed.
14' long × 8' wide × 5' high · 6 to 8 pickup-truck loads
About the size of a Dodge Caravan — you can already picture it
20' long × 8' wide × 7' high · 12 to 16 pickup-truck loads
Our practical guide helps you choose the right size for your project — renovation, demolition, soil, concrete, bricks, asphalt — with the conditions and the FAQ.
Libération Express
Every rental includes 7 days — 15 for contractors. But if you work fast, our quick-release promotion rewards you:
More than 48 hours after delivery, the promotion no longer applies — your 7-day rental simply continues, without the credit.
Freeing up dumpsters sooner is also what lets us deliver faster everywhere in Mirabel — everyone wins.
Offer valid during the high season (March to October).
A full dumpster is heavy, and drop-off and pickup are when asphalt gets marked. Every Megabac dumpster arrives clean, safe and fitted with the exclusive PROTEC-O-SOL system: built-in planks that spread the load and protect your asphalt, concrete or paved driveway. Nothing to supply, nothing extra to pay.
Even with the planks, the dumpster is still a steel box. Before the truck arrives, lay down four flattened cardboard boxes — or a thin sheet of plywood — where the dumpster will sit: the steel never touches your asphalt or your pavers directly. Two minutes of prep, zero worries.
The price depends on the size, the type of materials, how long you keep it — and your area. The form above or a two-minute call is all it takes to get your exact price, fast. What makes up the price, in plain words → And if you free up the dumpster within 48 hours of delivery, the Libération Express credit applies — details below.
Size is not the whole story: dumpsters are rented by material type. Each type goes to a different disposal facility — that is why mixed loads bring extra fees. One choice to make, five options:

10, 20 and 40 cubic yards
The do-it-all dumpster: wood, drywall, metal, shingles, furniture — mixed, no problem.

20 yard — the only size offered
Excavation, grading, sod removal — soil, rocks and sod, nothing else.

20 yard — the only size offered
Walkways, slabs, foundations — broken concrete, nothing else.

20 yard — the only size offered
Walls, chimneys, masonry facing — bricks and mortar, nothing else.

20 yard — the only size offered
Old torn-up paving, curb pieces — asphalt, nothing else.
Why it matters. A dumpster rented for concrete that shows up at the disposal facility with wood in it is refused at the concrete rate: the sorting gets billed back. If you have several types of materials, say so in the form or at 514 708-2424 — we point you to the right type, or to two dumpsters when that costs less than sorting fees.
Tires
Paint, solvents, oils
Propane, aerosols, acidsNot for the dumpster itself, placed entirely in a private driveway — and we word it carefully, because the conclusion comes from an absence of provision. The exhaustive table of certificates of authorization (by-law U-2303, s. 3.1.1) provides none for a temporary dumpster, and the only occurrence of a temporary container in the whole by-law covers the portable mini-warehouse — the storage cube, not the roll-off waste dumpster. The city states that absence nowhere explicitly: a doubt about your specific case gets settled with the Service de l'aménagement et de l'urbanisme, 450 475-2007, info.urbanisme@mirabel.ca, at 14111, rue Saint-Jean.
No — and in Mirabel the file is peculiar. The construction by-law requires « the required permits and certificates » to place materials on public property (U-2302, s. 2.1.3 c), yet the U-2303 table of certificates provides none for that case and no public-domain occupancy fee exists: an obligation with no published procedure. Add the nuisance by-law: depositing construction, demolition or renovation materials « on public or private land » is prohibited, under a minimum fine of 300 $, and the prohibition covers the ditches by name — which, in the rangs, is exactly the strip between the road and your lot. We deliver into the driveway, or we call the city together at 450 475-2007.
Here is the text, rather than a conclusion. The zoning table of accessory equipment in U-2300 does not allow the « residual materials container other than semi-buried » in the front yard — but the same by-law defines that container as a receptacle « closed and watertight […] fitted with a watertight, self-closing lid », which an open rental roll-off does not match; the attached standards — hidden from the public road, opaque enclosure for multi-family buildings — target permanent building equipment. In the TOD area of the Saint-Janvier station, the front-yard prohibition covers containers « implanted permanently » — words that on their own exclude a one-week rental. The side yard remains the safest placement, and your case gets validated at 450 475-2007.
Yes if the project is commercial, industrial, community or public, or if it is a housing development of more than three houses or dwellings: the construction by-law then requires, for the whole duration of the work, a dumpster of at least 4.5 m³ for construction waste, hauled to a dry materials recovery facility once full and replaced on the spot (U-2302, s. 2.1.3 d). A single-family home renovation is not covered by that obligation — but by-law 690 makes debris left on the land a nuisance « throughout the execution of the work » (s. 27): in practice, debris gets contained from day one. A useful benchmark: our 10 yard holds 7.6 m³, nearly 70% above the regulatory minimum.
For a resident's car trunk, yes — access is free, with no published annual visit quota, at any of the four sites. For a job site, no, and the door is triple-locked: industries, businesses, contractors and owner-builders are excluded; materials must be of household origin and in reasonable quantity; the trailer is capped at 5 × 12 feet and no heavy vehicle, tractor or dump body is admitted, except at Saint-Canut. The city's guide sums it up: « No garbage is accepted at the écocentre. » And everything comes out by hand, with no help from the attendant and no tools lent. Our volumes, for comparison: a 10 yard holds 7.6 m³, a 20 yard 15.3 m³, a 40 yard 30.6 m³.
Barely. It passes once a month, on a Friday, by zone, capped at 4 m³ — and its tolerance for construction debris is spelled out in numbers: 1 m³ or less per collection, in pieces of 1.2 metres or less, free of nails and screws, neatly stacked, tied or in sturdy transparent bags. Excluded are bulk materials (rock, stone, soil, concrete, asphalt, brick, ceramics), any item over 4 feet and anything coming from a contractor's work. The garbage bin helps no further: collection every two weeks, « no extras are collected », and the very definition of garbage excludes construction, renovation and demolition residue. By-law 1589 concludes at section 14.2: those materials get removed « by one's own means and at one's own expense » — that is the dumpster's job.
In Mirabel the question comes up more than elsewhere: any home whose building permit was issued after May 15, 2019, inside an urban perimeter or the white zone, must have its off-street parking paved, asphalted or concreted — and the city gained 26.3% more dwellings between 2016 and 2021: thousands of driveways are brand new. Every one of our dumpsters is delivered with the PROTEC-O-SOL system, built-in planks that spread the load and protect the surface. Nothing to supply, nothing extra to pay. Our drivers' tip, for full protection: lay four flattened cardboard boxes, or a thin sheet of plywood, on the chosen spot before the truck arrives.
And elsewhere? We checked the permit rule in every city we serve, by-law in hand — because it is never the same from one city to the next.
Check another city
We deliver to every neighbourhood in Mirabel — and we know the area.
Mirabel is huge: Statistics Canada measures it at 484.09 km² — the city describes itself over 486 km² — split into 13 sectors, from Saint-Janvier to Saint-Jérusalem, tied together by some 480 km of municipal roads. A customer in Domaine-Vert Sud and a customer in Saint-Benoît do not live in the same town in practice, and the truck plans its route accordingly. In residential zones, the access to the street is capped at 6 metres wide (9 m where two or three accesses are paired), and a lot under 17 m of frontage is allowed a single access: the dumpster and the car often share one driveway. A 20 yard box, roughly the size of a Dodge Caravan, fits without trapping the car when the spot is chosen ahead; the 10 yard equals a 20 yard filled halfway — same footprint, simply lower.
The second thing our drivers know about Mirabel is that it is new. The population jumped 21.0% between 2016 and 2021 — the fifth-fastest growth in Quebec among municipalities of 5,000 people or more — to reach 61,108 residents, and 54% of the 24,795 dwellings are single-detached houses. Above all, zoning requires that any home whose building permit was issued after May 15, 2019, inside an urban perimeter or the white zone, have its off-street parking paved, asphalted or concreted. Thousands of Mirabel driveways are therefore young and surfaced: that is exactly what the PROTEC-O-SOL system is for, and it comes with every box — built-in planks that spread the load. Our drivers' tip for full protection: four flattened cardboard boxes or a thin sheet of plywood on the chosen spot, before the truck arrives.
The third is the countryside: 87% of the territory is reserved for agriculture. In the rangs and the unserviced sectors — Petit-Saint-Charles and its bedrock, Saint-Jérusalem, part of Saint-Hermas — the strip between the driveway and the road is often a ditch, and the nuisance by-law protects the city's ditches and watercourses by name: nothing gets set down there. In Mirabel-en-Haut, homes stand on large wooded lots perched against cliff sides, on bedrock: the spot gets chosen on the phone, not at the end of the lane. And in spring, the thaw period can bring temporary signage restricting road-vehicle traffic on some roads — we check it when you book.
Statistics Canada, 2021 census profile (Mirabel, Ville), City of Mirabel, « À propos de Mirabel » and « Transports » pages, « Info — Stationnements » sheet (March 10, 2026, s. 6.2.13 of zoning by-law U-2300), land-use plan (June 2016), by-laws 690 (s. 22) and 717 (s. 13.08.01) — consulted August 17, 2026.
Mirabel is no side market: 2,400 businesses, 25,745 jobs on the territory, an airport that has been cargo-only since 2004 and runs 24 hours a day on its two 12,000-foot runways, and an aerospace cluster of 40 companies and more than 10,000 jobs — the city itself writes that one job in three here is directly tied to aerospace. The land-use plan counted, in 2014-2016, six industrial parks totalling 749.51 hectares — three municipal (the autoroute park, Curé-Labelle and Saint-Augustin) and three private (Développement Gouverneur, Saint-Canut and Aéroportuaire). Our rotations are built around that: 40 yard dumpsters for job sites that move, photo tracking of every delivery, SMS notifications on drop-off and pick-up, and flexible pick-up as your work progresses.
Above all, the construction by-law settles it for you: every commercial, industrial, community or public job site — and every housing development of more than three houses or dwellings — must carry, for the duration of the work, a dumpster of at least 4.5 m³ for construction waste; once full, it must be hauled to a dry materials recovery facility and replaced on the spot with an empty one. Our smallest format, the 10 yard, holds 7.6 m³: nearly 70% above the regulatory minimum — quick arithmetic. At the close of a job site, the same by-law requires the immediate removal of materials, debris and waste, the land restored to cleanliness within two weeks, and the site equipment gone within thirty days. The 50 $ Libération Express credit runs at that pace: it applies when the dumpster is freed up within 48 hours of delivery, during the March-to-October high season. Two local details we factor in by default: trucks follow the designated truck routes — the prohibition « does not apply in the case of delivery of goods », so a dumpster delivery is covered — and, in a loading zone, a stop may never exceed thirty minutes.
City of Mirabel, « À propos de Mirabel » and « Transports » pages, land-use plan (June 2016, section 3.7 — 2014 figures), by-laws U-2302 (s. 2.1.1 and 2.1.3) and 717 (s. 11.02, 13.07 and 13.08) — consulted August 17, 2026.
From December 1 to March 31, overnight parking is banned on Mirabel streets between midnight and 7 a.m. — and for trucks, tractors and trailers the ban runs year-round, at the same hours. The rule targets vehicles, never a dumpster; but it says what matters: at night, the roadway gets cleared across its full width, and the city maintains 525 km of it, plus 50 km of sidewalks and 1,600 fire hydrants, in two priority levels — routes 158, 148 and 117, highways 15 and 50 and chemin Saint-Simon fall to the ministère des Transports. Moving snow into the street, along the curb or onto cleared areas is prohibited. So the dumpster's spot is the private driveway — and it gets planned. Two relief valves do exist: from December 24 to January 2, overnight parking is tolerated if no new snow has fallen (the officer then issues a courtesy ticket), and the city opens 12 municipal lots spread across 6 sectors.
What winter changes is how crowded the driveway gets. The temporary car shelter is allowed from October 15 to May 1, up to 3.5 metres high, at least 1 metre from the sidewalk — or 1.2 metres from the pavement where there is no sidewalk — and 1 metre from a fire hydrant; zoning allows one on a lot under 17 metres of width, two between 17 and 50 metres, three beyond. On the big lots of Mirabel-en-Haut or the rangs, three shelters and a dumpster coexist easily; on a Domaine-Vert Sud lot, the shelter stands exactly where the box would go. Six months a year, a Mirabel driveway must hold the snow, the bins, sometimes the shelter — and the dumpster. Since the street is no fallback, that gets settled at booking, not on delivery morning.
City of Mirabel, « Déneigement » and « Stationnement » pages, by-law 717 (s. 11.12) and zoning by-law U-2300 (chapter 6, temporary car shelters) — consulted August 17, 2026.
Access is free and reserved for citizens of the residential sector, proof of residence and ID in hand, with no published annual visit quota. For a car trunk it is the right address — but the city's own guide warns: « No garbage is accepted at the écocentre. » Here is where the door closes.
| The rule | What it means for a job site |
|---|---|
| Contractors and owner-builders excluded | « Excluded: industries, businesses, contractors and owner-builders » — the door is closed to job sites, not merely to big volumes |
| Household origin, reasonable quantity | Materials must be of household origin and in reasonable quantity, the citizen must be present, proof of residence and identity required |
| Trailer capped at 5 × 12 feet | Authorization required beyond that, and no heavy vehicle, tractor or dump body is admitted — except at the Saint-Canut sector écocentre |
| Everything is unloaded by hand | No help from the attendant, engine off, no tools or equipment lent, and a 1.23 m guardrail in front of the bins |
| Four different schedules | Sainte-Scholastique opens only Wednesday and Saturday; everywhere, you must arrive at least 15 minutes before closing or access can be refused |
| Concrete, yes — but without rebar | Dry residential renovation materials are accepted (wood, brick, plaster, shingles, ceramics, asphalt), concrete only when free of rebar |
At the curb, the fallback is thinner still. The garbage bin runs every two weeks and « no extras are collected »; the by-law's definition of garbage expressly excludes construction, renovation and demolition residue. Bulky-item collection passes once a month, on a Friday, by zone, capped at 4 m³ — and its tolerance for construction debris is tiny: 1 m³ or less per collection, in pieces of 1.2 metres or less, free of nails and screws. Bulk materials — rock, stone, soil, concrete, asphalt, brick, ceramics —, any item over 4 feet and anything coming from a contractor's work are excluded. What remains is what by-law 1589 itself says at section 14.2: « Whoever wishes to dispose of bulk materials from demolition, construction or excavation must remove them or have them removed by their own means and at their own expense. » That is precisely what a dumpster does.
City of Mirabel, « Collectes et écocentres » page, practical guide to the écocentre (May 2022), by-law 1589 on the removal of household garbage and bulky items (s. 1, 4.4.4 and 14.2, administrative codification up to by-law 2678 of July 21, 2025) — consulted August 17, 2026.
Call us for fast, friendly, professional service — or fill out the form and we'll get back to you with the right size and the price.