Megabac Environnement — dumpster rental
HomeNorth Shore › Gore
White Megabac Environnement truck easing a waste dumpster down into a private driveway (archive fleet photo, city not identified)

10, 20 and 40 Cubic Yard Dumpster Rental in Gore

In Gore, Megabac Environnement delivers dumpsters across the whole territory: three sizes for mixed dry materials — 10, 20 or 40 cubic yards — plus four dumpsters reserved for a single material: soil-rock-sod, concrete, brick and mortar, asphalt. PROTEC-O-SOL planks are included. Road access is checked when you book. One call to 514 708-2424 gives you the size, the price and the date.

Same-day delivery when available Driveway protected — PROTEC-O-SOL Gore and the North Shore
5.0 227 Google reviews
Super compagnie !! Très bon service ! Ponctuel et courtois, je vous le recommande fortement !
Nicolas Proulx · Dorval
Excellente expérience du début à la fin. Service rapide, professionnel et très efficace. Je recommande fortement.
Nathalie Lauzon · Châteauguay
Super service! Le conteneur est arrivé comme prévu et un prix très raisonnable. Jonathan répond toujours au téléphone. Service à la clientèle impeccable!
Evgueni Kravtsov · La Prairie
J'ai loué un conteneur à déchets pour des rénovations, et tout s'est déroulé super bien. Ils sont vraiment professionnels, rapides, et je les recommande à 100 %.
Carl Grenier · Saint-Jean-sur-Richelieu

Free Quote!

It takes a minute — and the team gets back to you quickly.

5.0 · 227 Google reviews

What happens next. An advisor reviews your request — the size, your city and its rules, site access — then emails you a clear quote. If you decide to book, we phone you. For an urgent delivery, call 514 708-2424.

Our dumpster sizes

Dumpster rental — or bin rental, as many Montrealers call it — for the big cleanout, an estate, a renovation or a demolition: dry materials, soil, concrete, bricks, asphalt and more.

10 cubic yard Megabac dumpster

10 cubic yards

14' long × 8' wide × 2.5' high · 3 to 4 pickup-truck loads

A 20-yard filled halfway: same footprint, just lower — choosing it won't free up space in a short driveway.

  • Bathroom renovation
  • Garage and house cleanout
  • Small shed demolition

For guidance only — the exact size cannot be guaranteed.

20 cubic yard Megabac dumpster

20 cubic yards

14' long × 8' wide × 5' high · 6 to 8 pickup-truck loads

About the size of a Dodge Caravan — you can already picture it

  • Kitchen or bathroom renovation
  • Full garage and house cleanout
  • Shed demolition
40 cubic yard Megabac dumpster

40 cubic yards

20' long × 8' wide × 7' high · 12 to 16 pickup-truck loads

  • Demolition
  • Construction sites
  • Complete renovation

Not sure which size to pick?

Our practical guide helps you choose the right size for your project — renovation, demolition, soil, concrete, bricks, asphalt — with the conditions and the FAQ.

Read the guide

Libération Express

Done early? Pay less.

Every rental includes 7 days — 15 for contractors. But if you work fast, our quick-release promotion rewards you:

  1. Your dumpster is delivered The 48-hour clock starts.
  2. You free it up within 48 hours of delivery Dumpster loaded and pickup requested, by phone or text.
  3. You receive a $50 credit Applied straight to your credit card — deducted from any extras, or refunded in full if there are none.

More than 48 hours after delivery, the promotion no longer applies — your 7-day rental simply continues, without the credit.

Freeing up dumpsters sooner is also what lets us deliver faster everywhere in Gore — everyone wins.

Offer valid during the high season (March to October).

Our services in Gore

  • Same-day delivery available in some cases
  • Flexible pickup as your project moves along
  • All dry materials accepted: wood, drywall, shingles, plastic, metal
  • Private homes, contractors, businesses, factories and institutions
  • Text notifications at delivery and pickup
  • Photo record of every delivery
  • The truck can wait on site while you load
  • Service suited to LEED projects and green renovations

Why Megabac?

  • More than 15 years of dumpster management experience
  • Top-of-the-line equipment, spotless and washed regularly
  • A reputation for reliability, punctuality and personal service
  • Projects of every size, from private homes to industrial parks
  • Serving your whole sector: Gore, Saint-Colomban, Mirabel, Saint-Jérôme, Saint-Hippolyte, Sainte-Sophie

Your driveway is protected

A full dumpster is heavy, and drop-off and pickup are when asphalt gets marked. Every Megabac dumpster arrives clean, safe and fitted with the exclusive PROTEC-O-SOL system: built-in planks that spread the load and protect your asphalt, concrete or paved driveway. Nothing to supply, nothing extra to pay.

A tip from our drivers, for total protection

Even with the planks, the dumpster is still a steel box. Before the truck arrives, lay down four flattened cardboard boxes — or a thin sheet of plywood — where the dumpster will sit: the steel never touches your asphalt or your pavers directly. Two minutes of prep, zero worries.

How much does it cost?

Included in your rental

  • Delivery and pickup
  • 7 days of rental — 15 for contractors — whatever the size
  • The PROTEC-O-SOL protection planks
  • An included weight allowance, spelled out in your quote

What can be added

  • Going over the included weight, billed by the weigh ticket
  • Mixed loads in a single-material dumpster
  • Winter scraping fees, when materials have frozen to the walls

The price depends on the size, the type of materials, how long you keep it — and your area. The form above or a two-minute call is all it takes to get your exact price, fast. What makes up the price, in plain words → And if you free up the dumpster within 48 hours of delivery, the Libération Express credit applies — details below.

New — junk removal service

A crew fills the dumpster for you.

An estate, offices to clear, a cluttered house: the dumpster arrives, the crew from our partner BIUM SERVICE sorts, carries and loads — you never lift a finger.

Discover the service →

Roofing calculator

Redoing your roof?
Count your bundles.

Shingle bundles or square feet: the calculator converts to tons and shows the size that leaves without overage — in ten seconds.

Count my bundles →

Choose the right type of dumpster

Size is not the whole story: dumpsters are rented by material type. Each type goes to a different disposal facility — that is why mixed loads bring extra fees. One choice to make, five options:

Why it matters. A dumpster rented for concrete that shows up at the disposal facility with wood in it is refused at the concrete rate: the sorting gets billed back. If you have several types of materials, say so in the form or at 514 708-2424 — we point you to the right type, or to two dumpsters when that costs less than sorting fees.

Strictly refused, in every dumpster

Tires refused in every dumpsterTires
Paint and solvents refused in every dumpsterPaint, solvents, oils
Propane tanks refused in every dumpsterPropane, aerosols, acids

Frequently asked questions — Gore

Do I need a permit to place a dumpster in Gore?

Not for the dumpster itself, if it sits entirely on your land. We word it carefully because the conclusion comes from an absence of provision: the word « conteneur » appears nowhere in by-law 215 on the administration of planning by-laws, nor in 2026 taxation and fee by-law 274, and the single occurrence in zoning by-law 214 covers the shipping container converted into an accessory building (s. 85.1). The list of certificates of authorization in section 44 is closed — 23 cases, none for a temporary dumpster. The job site, however, often does need a permit: to build, rebuild, enlarge or alter a main building, an accessory building or an accessory structure. In doubt about your case? Planning department, 450 562-2025, extension 3526.

Is it true that a dumpster is mandatory on a job site in Gore?

Yes, and it is written in plain terms. Section 34 of construction by-law 217 says: « Construction debris or waste must be placed in containers provided for that purpose. During the work, a dumpster must be placed on the lot. » Nuisance by-law 272 completes the demonstration: construction materials left on a lot without a prior building permit are a prohibited nuisance (s. 5 b), and residual materials must be « stored in a shed, container or garbage can » (s. 13 a) — the same text filing « construction and demolition debris » under waste. In Gore the dumpster is not a convenience: it is what makes a job site compliant.

Can I have the dumpster placed on the road in front of my house?

Do not count on it, and the answer deserves its nuance. Section 32 of construction by-law 217 authorizes temporary occupation of the public domain « during the carrying out of construction work », for the duration of the work, provided it does not « impede circulation » — a more favourable text than in most towns, and it requires no prior written authorization. But by-law 100-1 prohibits the parking of road vehicles on all public roads from October 15 to April 15 inclusively, and at all times on named stretches of chemin Braemar, chemin Morrison, chemin Stephenson, chemin Cambria, chemin Sideline and chemin du Vieux-Pont; and soiling a road with construction materials is a nuisance whose cleaning is billed to you (by-law 272, s. 14). So we promise nothing on the roadway: the spot is on your land, or we call the Municipality together at 450 562-2025.

Can the Les Bons Voisins drop-off centre replace a dumpster?

For a car trunk, yes — and in Gore, unlike many towns, concrete, asphalt and brick are accepted there as « aggregates ». For a job site, no. Volume is capped at about 1.8 m³ per visit, « the equivalent of the box of a pickup truck or of an average trailer »; « unsorted construction waste, or construction waste in large quantity » is refused; sorting and unloading are entirely on you, engine off, and whatever is refused leaves with you. The centre also opens only on Saturday and Sunday from Thanksgiving to Patriots' Day, with Wednesday added the rest of the year. The arithmetic is quick: a 10 yard box holds 7.6 m³, a 20 yard 15.3 m³, a 40 yard 30.6 m³ — the 10 yard alone is more than four trips.

I am a contractor: can I use Gore's drop-off centre?

No, and for once the two sources agree. Section 11 of by-law 258 is blunt: « Only residents or citizens of the participating municipalities have access to the services of the Écocentre. Contractors, industries, businesses and institutions are not admitted. » The 2026 taxation and fee by-law sets no commercial rate that would soften the sentence. Worth remembering the other way round: municipal collection also refuses construction, renovation and demolition waste, and caps at 6 bags or 2 bins of 360 litres per dwelling unit. By-law 187 writes the rest itself: beyond that, « the occupant must take full responsibility for the collection of their residual waste by calling on a private contractor ».

My driveway is gravel and crosses a culvert — can the truck set the dumpster down?

That is THE question in Gore, and it gets settled on the phone. For an off-street parking space, zoning allows only a cellular system, two running strips at most 30 cm wide, gravel or crushed stone, or another permeable surfacing: the typical driveway here is not an asphalt slab. Every one of our dumpsters arrives fitted with the PROTEC-O-SOL system, built-in planks that spread the load — nothing to supply, nothing extra to pay. The culvert deserves a thought of its own: the model imposed by by-law 264 is 9 m long, 375 mm minimum diameter (300 mm in some cases), in BNQ-certified high-density polyethylene, with a compressive strength « of at least 210 kPa to allow automobile traffic ». Only the Municipality may install or replace it, at 2,000 $ per intervention request (2026 fees), and you answer for its degradation. So the right reflex is to place the dumpster on the right side of the culvert: tell us what you see when you book, and we choose the spot with you.

Will the truck find my cottage at the end of a lake road?

It does when we prepare the address together, and three local facts matter. First, five stretches of municipal road are closed and unmaintained under a by-law — chemin Rogers, chemin McDonald, an unnamed street north of Lac Solar, chemin des Montagnes and chemin Densa: the GPS does not know it. Second, trucks of 4,500 kg and over are banned from chemin Scott, chemin du Lac-Chevreuil and chemin Sideline, except to make a local delivery — so we do deliver to those addresses, without using those roads in transit. Third, since August 5, 2026, a building more than 30 m from the road must display a second civic number at the roadside, on a support within 5 m, and « this support may not be a tree or a garbage box ». It is a brand-new obligation: until it is visible everywhere, a landmark given over the phone saves the driver half an hour.

And elsewhere? We checked the permit rule in every city we serve, by-law in hand — because it is never the same from one city to the next.

Check another city
20 cubic yard dumpster propped on its PROTEC-O-SOL planks in a recently laid asphalt driveway Paving-stone slabs preserved under a Megabac dumpster fresh off the truck 40 cubic yard Megabac dumpster waiting for a swap on a construction site

Areas we serve in Gore

We deliver to every neighbourhood in Gore — and we know the area.

Lakefield (the village)Grace ParkLac Chevreuil sectorLac Barron sectorDomaine LakefieldParc du lac BeattieChemin CambriaChemin BraemarChemin ShrewsburyChemin ScottChemin SidelineChemin du Lac-HughesRoute 329

What our drivers check before the box comes down

We deliver everywhere in Gore, from Lakefield to the lake roads, and the truck plans its move before it leaves. Here the question is almost never « am I allowed? »: it is « can the truck reach the house? ». Zoning gives the measure. The longitudinal slope of an access lane may reach 12%, and 13.5% over a length of 30 m, while the access to the lot itself is limited to 3% over the first three metres from the edge of the road surface. Beyond 10 m in length, the lane must be laid out winding, so that water and sediment do not run down to the street, and it stays at least 2 m from the side lot lines. So three things get settled on the phone rather than in the driveway: lane length, slope and turning radius. The size benchmark still helps — a 10 yard box is a 20 yard filled halfway: same footprint, simply lower — but in Gore it is the access lane that decides, not the box. And the GPS is not enough: under a by-law, five stretches of municipal road are closed and unmaintained — chemin Rogers, chemin McDonald, an unnamed street north of Lac Solar, chemin des Montagnes and chemin Densa. Access is verified when you book, not once the truck is committed.

The second thing our drivers look at is the culvert. In Gore a private driveway almost always crosses the roadside ditch, and that culvert falls under a strict regime: by-law 264 forbids anyone from installing a new one, or from modifying, renovating or replacing a component of an existing one — « only the Municipality, or its duly authorized agent » may do it. The imposed model is 9 m long, 375 mm minimum diameter (300 mm in some cases), in BNQ-certified high-density polyethylene, with a compressive strength « of at least 210 kPa to allow automobile traffic ». The riverside owner answers for its degradation « resulting directly or indirectly from their action or negligence », the Municipality may remove a damaged culvert without notice, and a new one costs 2,000 $ per intervention request (2026 fees). That is why, at your place, the right reflex is not to push the truck as far in as possible: it is to choose the dumpster's spot on the right side of the culvert. We talk it through when you book.

The third is the surface. For an off-street parking space, Gore zoning allows only four surfacings: a concrete or plastic cellular system, two running strips at most 30 cm wide in asphalt, concrete or paver — the space between the strips staying grassed or in its natural state —, gravel or crushed stone, or any other permeable surfacing. So the typical driveway here is not a suburban asphalt slab. Every one of our dumpsters arrives fitted with the PROTEC-O-SOL system, built-in planks that spread the load: nothing to supply, nothing extra to pay. On soaked gravel our drivers' tip counts more than anywhere else — a thin sheet of plywood, or four flattened cardboard boxes, on the chosen spot before the truck arrives. One last detail, and it is brand new: since August 5, 2026, a building more than 30 m from the road must display a second civic number at the roadside, near the driveway entrance, on a support placed within 5 m of the road — and « this support may not be a tree or a garbage box ». Digits at least 100 mm high, on a contrasting background. In a township of about 95 km² where more than 300 lakes and water bodies cut up the territory, that is exactly what a driver needs.

Contractors, cottages and estate clear-outs in Gore

Gore has no industrial park, no farming and no ten-unit building. The Argenteuil regional county's 2023-2030 waste management plan counts, for 2020, 2,115 dwellings: 1,612 single-family homes, 463 cottages — 22%, 40 small multi-unit buildings of 2 to 9 units, and zero buildings of 10 dwellings or more. The same source records a seasonal population of 2,000 cottagers against 2,053 permanent residents, for an equivalent population of 4,053. The dumpster market here is cottage renovation, rebuilding an ageing lakeside housing stock, and estate clear-outs — not the multiplex. Our rotations are built around that: 40 yard dumpsters for job sites that move, single-material dumpsters for soil, concrete, brick and asphalt, photo tracking of every delivery, SMS notifications on drop-off and pick-up, and flexible pick-up as the work progresses.

For a contractor, the Municipality settles it for you twice over. First, the drop-off centre is closed to you: by-law 258 states « Contractors, industries, businesses and institutions are not admitted », and the 2026 taxation and fee by-law sets no commercial rate that would soften the sentence. Second, construction by-law 217 requires the dumpster of you: « During the work, a dumpster must be placed on the lot. » The same by-law sets the rest of the schedule: machinery, tools and equipment leave the lot within 7 days of the end of the work, and the lot is restored to a clean state within 14 days — the same delay after a demolition. Two site standards are worth knowing before you order: « all access ways to the site must be covered with stable, structuring materials », and a pile of excavated or fill material over 10 m³ may not be placed within 10 m of a street or a drainage ditch, nor within 20 m of the high-water mark. That is the most concrete argument for a single-material dumpster: the pile is regulated, the box is not. The 50 $ Libération Express credit rewards fast job sites: it applies when the dumpster is freed up within 48 hours of delivery, during the March-to-October high season.

Three logistical details we factor in by default. Trucks of 4,500 kg and over are banned from chemin Scott, chemin du Lac-Chevreuil and chemin Sideline, except to make a local delivery: so we do deliver to those addresses, but we do not use those roads in transit. Noisy work is prohibited between 10 p.m. and 7 a.m., seven days a week — the public safety by-law draws no weekend distinction, which is broader than elsewhere; in a lakeside cottage area, a box slamming at 7:05 on a Sunday is still a bad idea. Finally, the urban plan prohibits landfills, dry-material dumps and extractive activities across the whole territory: nothing is disposed of in Gore, everything that leaves a job site leaves the township — that is our job, and it is already in the price. Gore is also a recognized bilingual municipality, listed as such by the Office québécois de la langue française since 1978: our calls are answered in French and in English alike.

In winter the road is closed six months — the driveway holds everything

In Gore, winter does not shrink the room on the road: it removes it. By-law 100-1 prohibits the parking of road vehicles « on the public roads of the municipality during the periods from October 15 to April 15 inclusively of each year ». Six full months — longer than Blainville's overnight ban, which runs from midnight to 7 a.m. between November 15 and March 21. The fine is 30 $, an offence lasting beyond one day constitutes a separate offence each day, and the enforcement officer may have a vehicle in contravention moved so snow can be cleared, « the owner of the vehicle » being « liable for the towing costs ». Parking is also prohibited at all times on named stretches of chemin Braemar, chemin Morrison, chemin Stephenson, chemin Cambria, chemin Sideline and chemin du Vieux-Pont, and on chemin Beattie while the park is closed. From October to April there is therefore no fallback off your own land.

What changes then is how crowded the driveway gets. A temporary car shelter is allowed from October 1 to May 15 — seven and a half months —, at least 4.5 m from the front lot line and 1.5 m from the side lines, and it must be completely dismantled, supporting structure included, outside that period; on a lot of 6,000 m² or more it may stay year-round in the rear yard, 15 m from the side and rear lines. Snow fences follow the same calendar, from October 1 to May 15. Add the snow itself, which it is prohibited to « throw, cast or deposit on municipal property » when it comes from private land. And if your address is on one of the township's many private streets, snow clearing depends on a residents' association, not on the Municipality: its assistance program expressly excludes « the clearing of private driveways, of access roads to properties or of parking areas ». The Municipality itself maintains about 75 km of roads, ditches and shoulders. Two questions are therefore part of a winter booking: where does the snow go, and who clears what, how far.

Why the drop-off centre is not enough in Gore

Gore's drop-off centre is called Les Bons Voisins, at 40 chemin Sideline. It does not belong to Gore alone: born of an intermunicipal agreement signed in 2012 between the Township of Gore, the Township of Wentworth and the Municipality of Mille-Isles, opened to the public in June 2013, it is managed by the Township of Gore, to which the agreement delegates enforcement of the by-law. First piece of news, and it is a rare one: concrete, asphalt and brick are accepted there, as « aggregates ». For a car trunk or a small trailer, it is the right address. Here is where the door closes.

The ruleWhat it means for a job site
Contractors not admitted« Contractors, industries, businesses and institutions are not admitted » — access is reserved for residents of Gore, Mille-Isles and Wentworth
About 1.8 m³ per visit« The equivalent of the box of a pickup truck or of an average trailer » — less than a quarter of a 10 yard dumpster
Unsorted construction waste refused« Unsorted construction waste, or construction waste in large quantity » is refused, as are asbestos, fibreglass, contaminated soil, yard waste and trees, branches and stumps
Everything is sorted and unloaded by hand« Users must sort, deposit and unload their materials themselves »; whatever is refused leaves with the user, engine off, and the site is under video surveillance
Two days out of seven half the yearSaturday and Sunday from Thanksgiving to Patriots' Day, Wednesday added the rest of the year; 9 a.m. to 4:30 p.m. according to the municipal page
Number of visits cappedThe Municipality's page and the 2026 fee by-law do not word it the same way, and charges apply beyond a certain number — to be confirmed at 450 562-2025

At the roadside, the fallback is thinner still. Municipal collection refuses construction, renovation and demolition waste — in both the first and second streams, by-law 187 refers you by name « to the municipal drop-off centre or to a dry materials sorting centre ». It also caps collection at 6 bags or 2 wheeled bins of 360 litres per dwelling unit, that is 0.72 m³, and at a single 360-litre bin for recycling. The by-law writes the rest itself: « If the quantity of residual waste exceeds the maximum quantity, the occupant must take full responsibility for the collection of their residual waste by calling on a private contractor. » It also prohibits accumulating waste beyond the period between two collections — in Gore, two weeks, over two zones: the blue zone on Tuesdays, the white zone on Thursdays, with bulky waste once a month. The arithmetic is quick: a 10 yard box holds 7.6 m³, a 20 yard 15.3 m³, a 40 yard 30.6 m³.

Municipality of the Township of Gore, by-law 258 on the operation and safety of the Écocentre (s. 7, 9, 10, 11, 13, 15, 16, 19, 20, 23 and 28), by-law 187 on the collection, transport and disposal of residual materials (s. 4, 11, 14, 15, 16, 18, 20, 21, 22, 23 and 24), 2026 taxation and fee by-law 274 (s. 6, 7 and 15), « Collecte des matières résiduelles » page, 2026 collection calendar and zone map, Argenteuil regional county — 2023-2030 waste management plan — consulted August 20, 2026. The schedule published here is the one on the municipal page; the by-law allows the Municipality to change opening hours without notice, hence the referral to 450 562-2025.

We also deliver nearby

Book your dumpster in Gore

Call us for fast, friendly, professional service — or fill out the form and we'll get back to you with the right size and the price.