Megabac Environnement — dumpster rental

← The Megabac blog

Tearing down a shed in a weekend

August 23, 2026 · 6 min read

A small shed comes down into a 10 yard dumpster — 3 to 4 pickup truck loads — and a regular shed into a 20 yard, about the size of a Dodge Caravan. Wood, sheet metal, shingles and whatever was stored inside all leave mixed in the same dry materials box. Delivered Friday, torn down Saturday, pickup requested within 48 hours: the $50 Libération Express credit applies. Here is the plan, roof to floor.

Two sizes cover almost every shed

A shed comes down in a weekend: big enough to justify a dumpster, small enough to be done by Sunday night. The one real decision comes before the first swing: the size of the box.

Small shed: the 10 yard. The tool shed, the single-door garden shed: 3 to 4 pickup truck loads of debris, no more. The box is 14 ft by 8 on the ground and 2.5 ft high — a low wall you load at arm's height, nothing thrown over a shoulder.

Regular shed: the 20 yard. Same rectangle on the ground — 14 ft by 8 — but 5 ft high, for 6 to 8 pickup truck loads: about the size of a Dodge Caravan. It is the size the size guide recommends for tearing down a shed, and its margin absorbs the part everyone forgets: whatever is still stored inside comes down too. A large shed packed to the rafters, though, can tip into the 40 yard — the pickup-load count decides.

Between the two, one useful rule: dropping to the 10 yard frees no room in the driveway — the footprint is the same. You pick the 10 for the volume, never for the space.

What goes in the box — and what never does

A demolished shed is the textbook case for the mixed dry materials dumpster: just about everything it is made of leaves mixed, no sorting. The exceptions fit on one hand — and they get settled before you start.

Into the same box, no sorting

  • The wood — framing, walls, floor, doors and shelving: most of the shed.
  • The whole roof — asphalt shingles, sheet metal (metal rides with the wood), paper and membranes.
  • The rest — drywall, insulation, plastic, and the furniture that was sleeping in there.

Never in that box

  • The concrete slab. Concrete rents its own dumpster — slipped into the mixed box, it flips the whole load to the sorting rate. Concrete, soil, asphalt: why a separate dumpster explains the rule.
  • Tires — even the wheelbarrow's or the trailer's stored inside: not accepted in any dumpster.
  • Chemicals — paint, solvents, oils, propane, aerosols, acids: the classic back shelf of a shed. Pull them out and set them aside before demolition.

Shingle roof? Count your bundles

If the roof is sheet metal, nothing to calculate: it goes down with the rest. If it is asphalt shingles, one reflex before ordering — shingles weigh more than they look, and their weight can be worked out ahead with two numbers: one bundle covers 32 sq ft of roof, and 25 bundles weigh 1 ton. Divide the roof area by 32 and the answer lands in bundles.

For a shed, the verdict is reassuring: it takes 800 sq ft of roof to reach the 25 bundles of a ton — no shed comes close. The ton included with the 10 yard absorbs the shingles along with the rest of the building, and the 20 yard's 2 included tons leave even more margin. The full math, with the table by roof area, is in How much does a shingle roof weigh? — worth keeping for the day the house's own roof gets redone.

The weekend, top to bottom

The rule that keeps a shed demolition safe fits in one sentence: you take it apart in the reverse order it was built — roof, then walls, then floor — and nobody works underneath what is still to come down. Laid over a weekend, it looks like this:

  1. Friday: the dumpster is delivered As close to the shed as access allows — every step counts when everything moves by hand. The PROTEC-O-SOL planks are included, the driveway is protected, and the Libération Express 48-hour clock starts.
  2. Saturday morning: empty it, then the roof The shed gets emptied first — anything left inside becomes a trap underfoot. Then the roof comes down, piece by piece, with nobody inside while you work above.
  3. Saturday afternoon: the walls One wall at a time, never two at once, and protruding nails get hammered flat as you go — the most needless injury on a shed job. Gloves, glasses and boots are not negotiable.
  4. Sunday: the floor, then the box is freed The floor leaves last, the yard gets raked, and the pickup request goes in by call or text to 514 708-2424. Made within 48 hours of delivery, it earns the $50 Libération Express credit — applied straight to your card.

Past 48 hours after delivery, the promotion no longer applies — your 7-day rental simply continues, without the credit.

Job running long? No rush: every rental includes 7 days — 15 for contractors. The credit rewards speed, it never demands it.

Offer valid during the high season (March to October).

Unsure about the size or the access?

The size guide settles it in three questions — what you are throwing out, how big the job is, where the box will sit — with the real dimensions of all three sizes.

Free quote

It takes a minute — and the team gets back to you quickly.

5.0 · 227 Google reviews

What happens next: we email you the quote: recommended size, exact price and possible date. Describe the shed — its size, what is still inside, and whether a concrete slab is going too: that is what decides the size.

The questions that come up before tearing down

What size dumpster to tear down a shed?

The 10 yard for a small shed — 3 to 4 pickup truck loads of debris — and the 20 yard for a regular shed: 6 to 8 loads, about the size of a Dodge Caravan. Both set down the same 14 ft by 8 rectangle; only the height changes. When in doubt, whatever is still stored in the shed usually tips the choice to the 20.

Do the roof shingles go in the same dumpster as the wood?

Yes. The dry materials box takes wood, shingles, metal, drywall and insulation mixed together, no sorting. Just count their weight: one bundle of shingles covers 32 sq ft and 25 bundles weigh a ton — a shed roof is nowhere near that.

My shed sits on a concrete slab. Does it go in the same box?

No. Concrete rents its own dumpster because it goes to a different disposal facility: slipped into the mixed box, it flips the whole load to the sorting rate. If the slab is going too, say so on the quote — we look at whether two boxes beat one.

Can I keep the dumpster longer than a weekend?

Yes: every rental includes 7 days — 15 for contractors — and extends by arrangement if the job stretches. Libération Express works the other way: a dumpster freed within 48 hours of delivery earns a $50 credit, during the high season from March to October.

Shed coming down this weekend?

A two-minute call confirms the size, the price and the date. Delivery Monday to Friday, PROTEC-O-SOL planks included to protect your driveway.